Planning application
30A, LLOYD BAKER STREET, WC1
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
First floor side extension to existing residential building. Applicants Plan Nos: DS/425/01b-04b, 05a,06a DS/425/15c; DS/425 16c-19c, 20b
As published by the council, reference P002637
Application record
- Reference
- P002637
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 27 Nov 2000
- Validated
- 16 Feb 2001
- Decided
- 20 Feb 2001
- Ward
- X-Clerkenwell
- Decision by
- Planning Committee
Site history
Applications at this address on the Islington register
This site has had 4 applications since 2000: 2 approved, 2 refused.
-
P002638 Granted
30A, LLOYD BAKER STREET, WC1
Listed Building Consent in relation to internal alterations, repairs and first floor side extension to existing building. Applicants Plan Nos: DS425/01b-04b,05a,06a DS/425/15c; DS/425/165c-19c, 20b
-
P002636 Refused
30A, LLOYD BAKER STREET, WC1
Listed Building Consent in connection with internal alterations, repairs and ground floor rear extension to existing building. APPLICANTS' PLAN NOS.: 01b, 02b, 03b, 04b, 05a, 06a, 10a, 11a, 12a, 13a, 14a
-
P002635 Refused
30A, LLOYD BAKER STREET, WC1
Construction of a ground floor rear extension. APPLICANTS PLAN NOS. 01b, 02b, 03b, 04b, 05a, 06a, 10a, 11a, 12a, 13a, 14a
Timeline
Dates from the published record
-
27 Nov 2000
Received by Islington
-
16 Feb 2001
Validated
Checked as complete and ready for consideration.
-
20 Feb 2001
Decision issued: Approve with conditions
-
18 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 20 February 2001, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/2262/FUL Status unknown
28 Highbury Park, London, N5 2AA
Installation of inward facing bi-fold windows (retrospective).
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com