Skip to content
PlanIndex Get alerts
Menu

Planning application

132-134, ESSEX ROAD, N1

Granted Islington P002558 Full Planning Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

First floor rear building extension for ancillary A1 use. APPLICANTS' PLAN NOS.: ETC LP, 01-05, 06A; 07A; 08A; 09A.

As published by the council, reference P002558

Application record

Reference
P002558
Type
Full Planning Application
Status
FINAL DECISION
Decision
Approve with conditions
Received
20 Nov 2000
Validated
12 Apr 2001
Decided
1 May 2001
Ward
X-St Peters
Decision by
Planning Committee

Site history

Applications at this address on the Islington register

This site has had 4 applications since 2000: 4 approved, 0 refused.

  • P020851 Granted

    132-134, ESSEX ROAD, N1

    Erection of internally illuminated projecting box sign on store frontage and ATM surround sign APPLICANTS' PLAN NOS.: 0128/SIGN; 0128-091-DP01

    Decided 9 May 2002 Advertising
  • P020155 Granted

    132-134, ESSEX ROAD, N1

    Erection of one fascia sign and one projecting sign on front elevation.

    Decided 12 Mar 2002 Advertising
  • P012405 Granted

    132-134, ESSEX ROAD, N1

    Installation of new shopfront with automatic sliding door and installation of automatic teller machine on the Essex Road elevation. APPLICANTS' PLAN NOS.: Site Plan 593.01 593.03H Letter dated 26th February 2002

    Decided 26 Mar 2002 Full applications

Timeline

Dates from the published record

  1. 20 Nov 2000

    Received by Islington

  2. 12 Apr 2001

    Validated

    Checked as complete and ready for consideration.

  3. 1 May 2001

    Decision issued: Approve with conditions

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Islington granted permission on 1 May 2001, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Islington

  • P2026/2205/FUL Status unknown

    Flat 3, 8 Birnam Road, London, N4 3LQ

    Erection of a rear dormer roof extension and a rear roof terrace with a railing

    4 Sep 2026 Full applications
  • P2026/1941/FUL Status unknown

    Flat A, 10 Loraine Road, London, N7 6EZ

    Replacement of an existing external step to access the rear garden.

    3 Sep 2026 Full applications
  • P2026/1722/FUL Refused

    Pavement outside 2-4 Archway Close, London, N19 3TD

    The proposed deployment of a Street Hub 3 unit with associated digital advertise

    13 Jul 2026 Full applications
  • P2026/2280/FUL Status unknown

    Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR

    A new secondary access gate adjacent to the Community Room at Margery Street Com

    3 Sep 2026 Full applications
  • P2026/1507/FUL Granted

    Ground Floor, 257 Caledonian Road, London, N1 1ED

    Alterations to shopfront including new aluminium-composite panels to integrate d

    9 Jun 2026 Full applications