Planning application
59-61, EXMOUTH MARKET, EC1
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement of existing extract equipment and plant with new equipment and plant at the rear, installation of carbon filters and acoustic enclosure for the equipment. APPLICANTS' PLAN NOS.: 1387/AL(00)01B Planning sketches 1/5 - 5/5 Faxes dated 03/04/2001 from Chapman Ventilation Ventilation Re.: noise/smell attenuation measures.
As published by the council, reference P001936
Application record
- Reference
- P001936
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 5 Sep 2000
- Validated
- 22 May 2001
- Decided
- 13 Jul 2001
- Ward
- X-Clerkenwell
- Decision by
- Delegated
Site history
Applications at this address on the Islington register
This site has had 4 applications since 2000: 3 approved, 1 refused.
-
P001980 Refused
59-61, EXMOUTH MARKET, EC1
Variation of Condition 3 of permission of 18th April 1986 (reference 85/1898) to allow ground floor and basement restaurant to operate until midnight on any day.
-
P001084 Granted
59-61, EXMOUTH MARKET, EC1
Installation of various illuminated advertisements. Applicants Plan Nos: AL/00/01B,02A,03D,04E
-
P001083 Granted
59-61, EXMOUTH MARKET, EC1
Installation of a new shopfront. Applicants Plan Nos: AL/00/01B,02A,03D,04E as amended by letter 22/08/00
Timeline
Dates from the published record
-
5 Sep 2000
Received by Islington
-
22 May 2001
Validated
Checked as complete and ready for consideration.
-
13 Jul 2001
Decision issued: Approve with conditions
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 13 July 2001, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/2262/FUL Status unknown
28 Highbury Park, London, N5 2AA
Installation of inward facing bi-fold windows (retrospective).
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com