Planning application
786, HOLLOWAY ROAD, N19
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of rear single storey extension to provide an additional dining room.
As published by the council, reference P000708
Application record
- Reference
- P000708
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 31 Mar 2000
- Validated
- 29 Jun 2000
- Decided
- 26 Jul 2000
- Ward
- X-Hillrise
- Decision by
- Delegated
Site history
Applications at this address on the Islington register
This site has had 4 applications since 2000: 2 approved, 2 refused.
-
P011794 Refused
786, HOLLOWAY ROAD, N19
Change of use to form 1x1 bed flat and 1x2 bed maisonette. Construction of extensions at first and second floor and new rear dormer extension.
-
P010526 Refused
786, HOLLOWAY ROAD, N19
Construction of rear extensions at first and second floor level; rear and front dormer windows and conversion of existing maisonette into three self-contained flats APPLICANT'S PLAN NOS.: AK/D/89A; AK/D/90; AK/D/91
-
P001738 Granted
786, HOLLOWAY ROAD, N19
Approval of brick and roofing tile details pursuant to Condition 2 of planning consent ref.P000708 dated 27th July 2000 APPLICANT'S PLAN NOS.: Letter from A.Koulle dated 9th August 2000
Timeline
Dates from the published record
-
31 Mar 2000
Received by Islington
-
29 Jun 2000
Validated
Checked as complete and ready for consideration.
-
26 Jul 2000
Decision issued: Approve with conditions
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Islington granted permission on 26 July 2000, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d