Planning application
TOLLINGTON PARK BAPTIST CHURCH, TOLLINGTON PARK, N4
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redevelopment to provide a new Baptist Church and ancillary accommodation together with a four storey building providing 26 new flats. Applicants Plan Nos: 567-61,62,63,64.
As published by the council, reference 991449
Application record
- Reference
- 991449
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Approve with conditions
- Received
- 23 Jul 1999
- Validated
- 20 Mar 2000
- Decided
- 18 Apr 2000
- Decision by
- Planning Committee
Timeline
Dates from the published record
-
23 Jul 1999
Received by Islington
-
20 Mar 2000
Validated
Checked as complete and ready for consideration.
-
18 Apr 2000
Decision issued: Approve with conditions
-
18 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Flat B, 360 Hornsey Road, London, N19 4HT
Non-material amendment to planning permission ref: P2018/1049/FUL dated 15/05/2018 [as amended by agreed non-material amendment ref: P2018/1893/NMA]. Amendments include alterations to glazing, window and doors at rear; reduction of rear foul pipe; and position and scale of rooflights.
Decided Amendments Loft or dormer Windows or glazing 6 docs -
366 Hornsey Road, London, N19 4HT
Conversion of the ground floor retail unit from Class E(a) to Class C3, reconfig
Refused Full applications -
299-303 Hornsey Road, London, N19 4HN
86% historically approved · decision due ~13 May
Erection of a new mansard roof extension with associated front and rear dormer windows and external staircase, to facilitate the provision of 2 x 1-bed 2-person self-contained flats with cycle and refuse storage.
Awaiting decision Full applications New dwelling Extension +2 24 docs -
9 Birnam Road, London, N4 3LJ
Change of use from dwelling house to large HMO (sui generis use) and erection of upper floor/roof extension.
Refused Householder Extension 25 docsDomestic -
Flat A, 1 Wray Crescent, London, N4 3LN
100% historically approved · decision due ~5 Nov
T1 Lime tree pollard as part of routine tree management. T2 Lime tree pollard as part of routine tree management. The regrowth is approximately 2m in length so the pollarding back to previous will remove that new re growth.
Awaiting decision Trees 6 docs -
15, BT PLC, British Telecom Telephone Exchange, Pine Grove, London, N4 3LL
98% historically approved · decision due ~23 May
Approval of details pursuant to Condition 5 (to assess the noise from the proposed mechanical plant to demonstrate compliance with condition 4) of planning permission reference: P2022/2667/FUL, dated: 17/11/2022 Installation of No.14 PPC steel frames to existing windows in service yard; Installation of No.2 new external louvers to the existing window openings; Installation of No.18 new roof top condensing units and No.10 pumps within a new 3m tall open top acoustic louver screen; Removal of existing roof top plant room; Replacement of the existing access gate; and Erection of a single storey transformer brickwork enclosure.
Awaiting decision Conditions Roofing Windows or glazing 3 docsSmall domestic
Other full applications applications
In Islington
-
P2026/2205/FUL Status unknown
Flat 3, 8 Birnam Road, London, N4 3LQ
Erection of a rear dormer roof extension and a rear roof terrace with a railing
-
P2026/1941/FUL Status unknown
Flat A, 10 Loraine Road, London, N7 6EZ
Replacement of an existing external step to access the rear garden.
-
P2026/1722/FUL Refused
Pavement outside 2-4 Archway Close, London, N19 3TD
The proposed deployment of a Street Hub 3 unit with associated digital advertise
-
P2026/2280/FUL Status unknown
Margery Street Community Hall, 1 Margery Street, London, WC1X 0HR
A new secondary access gate adjacent to the Community Room at Margery Street Com
-
P2026/1507/FUL Granted
Ground Floor, 257 Caledonian Road, London, N1 1ED
Alterations to shopfront including new aluminium-composite panels to integrate d