Proposal
Condition compliance application on 25/01534/RVC for conditions 3 (Phasing Plan), 4 (Trial Trench Evaluation), 6 (Archaeological Notification), 7 (Construction Management Plan), 8 (Ecological Management Plan), 10 (Drainage), 11 (Arboreal Method Statement), 12 (Junction Details), 13 (On Site Layout), 14 (Sight Lines), 16 (Pedestrian Crossings) and 20 (Hard Surfaces)
As published by the council, reference 26/00990/DIS
Application record
- Reference
- 26/00990/DIS
- Status
- Registered
- Received
- 22 Jul 2026
- Validated
- 24 Jul 2026
- Ward
- Bembridge
- Parish
- Bembridge
Site history
Applications at this address on the Isle of Wight register
This site has had 4 applications since 2025: 2 approved, 0 refused.
-
26/00540/OWC Granted
Land North Of Steyne Road And Land Served Off Mill Road And High Street Bembridge Isle Of Wight
Ordinary Watercourse Consent for proposed headwall discharging surface water from proposed wetland basin into an existing ditch to the south of the site
-
25/01614/DIS Decided
Land North Of Steyne Road And Land Served Off Mill Road And High Street Bembridge Isle Of Wight
Condition compliance application on 23/01920/FUL relating to condition 5 (Archaeological Works)
-
25/01534/RVC Granted
Land North Of Steyne Road And Land Served Off Mill Road And High Street Bembridge Isle Of Wight
Variation of condition 2 on 23/01920/FUL to allow for revisions to house type design and site layout
Timeline
Dates from the published record
-
22 Jul 2026
Received by Isle of Wight
-
24 Jul 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 18 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Isle of Wight took a median of 57 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01534/RVC Granted
Land North Of Steyne Road And Land Served Off Mill Road And High Street Bembridge Isle Of Wight
Variation of condition 2 on 23/01920/FUL to allow for revisions to house type design and site layout
Documents
Plans, drawings, consultee responses and the officer's report
59 documents on file for this application
- LEAD LOCAL FLOOD AUTHORITY - REQUEST FOR INFORMATION
- ARCHAEOLOGICAL OFFICER
- MR JERRY WILLIS
- MR ISLAND ROADS
- APPLICATIONFORMREDACTED
- ATTACHMENTSUMMARY
- AIA AND METHOD STATEMENT
- CONSTRUCTION MANAGEMENT PLAN
- APPENDIX A - CONSTRUCTION MANAGEMENT PLAN JUL26
- APPENDIX B - CONSTRUCTION TRAFFIC ROUTES JUL26
- APPENDIX B-1 - CONSTRUCTION TRAFFIC ROUTES
- APPENDIX C - COMPOUND LAYOUT PLAN JUL26
- APPENDIX D - PHASING PLAN JUL26
- APPENDIX E - EXTENT OF CONDITION SURVEYS
- PHASING PLAN
- COVER LETTER
- CONSTRUCTION MANAGEMENT PLAN
- APPENDIX A - CONSTRUCTION MANAGEMENT PLAN JUL26
- APPENDIX B - CONSTRUCTION TRAFFIC ROUTES JUL26
- APPENDIX B-1 - CONSTRUCTION TRAFFIC ROUTES
- APPENDIX C - COMPOUND LAYOUT PLAN JUL26
- APPENDIX D - PHASING PLAN JUL26
- APPENDIX E - EXTENT OF CONDITION SURVEYS
- PHASING PLAN
- COVER LETTER
- ARCHAEOLOGICAL TRENCHING REPORT
- GROUND INVESTIGATION REPORT
- BEM1-SMA-XX-XX-DR-C-0631 S278 LEVELS, DRAINAGE, LINES & SIGNS (STEYNE ROAD) PED
- BEM1-SMA-XX-XX-DR-C-0630 S278 SCHEME, CLEARANCE & FINISHES (STEYNE ROAD) PED CRO
- BEM1-SMA-XX-XX-DR-C-0621 S278 LEVELS, DRAINAGE, LINES & SIGNS (MILL ROAD) JUNCTI
- BEM1-SMA-XX-XX-DR-C-0611 S278 LEVELS, DRAINAGE, LINES & SIGNS (HIGH STREET, MILL
- BEM1-SMA-XX-XX-DR-C-0610 S278 SCHEME, CLEARANCE & FINISHES (HIGH STREET, MILL RO
- BEM1-SMA-XX-XX-DR-C-0620 S278 SCHEME, CLEARANCE & FINISHES (MILL ROAD) JUNCTION
- BEM1-SMA-XX-XX-DR-C-0602 S278 LEVELS, DRAINAGE, LINES & SIGNS (HIGH STREET JUNCT
- BEM1-SMA-XX-XX-DR-C-0601 S278 SCHEME, CLEARANCE & FINISHES (HIGH STREET JUNCTION
- BEM1-SMA-XX-XX-DR-C-0600 S278 GENERAL ARRANGEMENT P05
- BEM1-SMA-XX-XX-DR-C-0537 HIGHWAY CONSTRUCTION DETAILS SHEET 2 OF 2 P02
- BEM1-SMA-XX-XX-DR-C-0536 HIGHWAY CONSTRUCTION DETAILS SHEET 1 OF 2 P04
- BEM1-SMA-XX-XX-DR-C-0528 DRAINAGE CONSTRUCTION DETAILS SHEET 3 OF 3 P01
- BEM1-SMA-XX-XX-DR-C-0526 DRAINAGE CONSTRUCTION DETAILS (SECTION 104) SHEET 1 OF
- BEM1-SMA-XX-XX-DR-C-0513 PAVEMENT FINISHES SHEET 6 OF 6 P09
- BEM1-SMA-XX-XX-DR-C-0512 PAVEMENT FINISHES SHEET 5 OF 6 P09.
- BEM1-SMA-XX-XX-DR-C-0506 SCHEME LAYOUT SHEET 5 OF 6 P08
- BEM1-SMA-XX-XX-DR-C-0507 SCHEME LAYOUT SHEET 6 OF 6 P08
- BEM1-SMA-XX-XX-DR-C-0508 PAVEMENT FINISHES SHEET 1 OF 6 P10
- BEM1-SMA-XX-XX-DR-C-0509 PAVEMENT FINISHES SHEET 2 OF 6 P09
- BEM1-SMA-XX-XX-DR-C-0510 PAVEMENT FINISHES SHEET 3 OF 6 P09
- BEM1-SMA-XX-XX-DR-C-0511 PAVEMENT FINISHES SHEET 4 OF 6 P09
- 7357-SMA-XX-XX-DR-C-0001 DRAINAGE STRATEGY S0 P05
- 7357-SMA-XX-XX-DR-C-0002 IMPERMEABLE AREAS PLAN S0 P03
- 7357-SMA-XX-XX-DR-C-0021 FLOOD EXCEEDANCE PLAN S0 P01
- BEM1-SMA-XX-XX-DR-C-0502 SCHEME LAYOUT SHEET 1 OF 6 P09
- BEM1-SMA-XX-XX-DR-C-0503 SCHEME LAYOUT SHEET 2 OF 6 P08
- BEM1-SMA-XX-XX-DR-C-0504 SCHEME LAYOUT SHEET 3 OF 6 P08
- BEM1-SMA-XX-XX-DR-C-0505 SCHEME LAYOUT SHEET 4 OF 6 P08.
- 7357.TN03 - DRAINAGE MAINTENANCE & MANAGEMENT PLAN BOUND.
- 7357 SURFACE WATER NETWORK FIRST FLUSH COMPLIANCE 2026.07.09 - ENHANCED BASIN &
- 7357 SURFACE WATER NETWORK DETAILED REPORT 2026.07.09 - ENHANCED BASIN & VE UPDA
- 7357 DRAINAGE STRATEGY ADDENDUM V03-02 BOUND.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Isle of Wight for determination, against a statutory target of eight weeks. Over the last year Isle of Wight's median decision took 57 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Isle of Wight's portal will say. Our guide explains the common types.