Skip to content
PlanIndex Get alerts
Menu

Planning application

Cliff End Monks Lane Freshwater Isle Of Wight PO40 9XA

Granted Isle of Wight 26/00966/TW

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendment to proposed works: Application as per site meeting as part of a small woodland plan. G1; Group of Sycamore (Acer pseudoplatanus) as depicted on attached picture - Strip Coppice to stools ( approximately 5M from grassed edge) to prevent the spread of saplings/monoculture. Crown lift larger Sycamores (Acer pseudoplatanus) in group to 4M to reduce excessive shade. G2; Works to be carried out 2 years minimum from G1,Group of Sycamore (Acer pseudoplatanus) as depicted on attached picture - Strip Coppice to stools, to prevent the spread of saplings/monoculture. G3; Works to be carried out 2 years minimum from G2, Group of Sycamore (Acer pseudoplatanus) as depicted on attached picture - Strip Coppice to stools,to prevent the spread of saplings/monoculture. G4; Works to be carried out 2 years minimum from G3, Group of Sycamore(Acer pseudoplatanus) as depicted on attached picture - Strip Coppice to stools,to prevent the spread of saplings/monoculture.

As published by the council, reference 26/00966/TW

Application record

Reference
26/00966/TW
Status
Decided
Decision
Granted
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Totland And Colwell
Parish
Freshwater
Postcode
PO40 9XA

Timeline

Dates from the published record

  1. 17 Jul 2026

    Received by Isle of Wight

  2. 27 Jul 2026

    Added to PlanIndex

  3. 9 Oct 2026

    Status changed to Decided

    Previously Registered.

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

  • APPLICATIONFORMREDACTED Application Form - Public Copy · 17 Jul 2026
  • LOCATION PLAN Plan - Location · 17 Jul 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Isle of Wight granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Isle of Wight's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles