Planning application
Kingston Marine Park Saunders Way East Cowes Isle Of Wight
Relates to 25/01808/RVC
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Condition compliance application on 25/01808/RVC for conditions 7 (Habitat Management and Monitoring Plan), 9 (Landscaping), 16 (Contamination) and the Biodiversity Gain Plan condition
As published by the council, reference 26/00871/DIS
Application record
- Reference
- 26/00871/DIS
- Status
- Registered
- Received
- 25 Jun 2026
- Validated
- 26 Jun 2026
- Ward
- Osborne
- Parish
- East Cowes
Site history
Applications at this address on the Isle of Wight register
This site has had 3 applications since 2024: 2 approved, 0 refused.
-
25/01808/RVC Granted
Kingston Marine Park Saunders Way East Cowes Isle Of Wight
Variation of conditions 2 and 19 on 24/01137/FUL to allow for amendments to site layout including internal roadways and siting of reduced workshop buildings; drainage details
-
24/01137/FUL Granted
Kingston Marine Park Saunders Way East Cowes Isle Of Wight
Creation of new film and TV studios including four sound stages, two workshops and production support facilities; parking and landscaping
Timeline
Dates from the published record
-
25 Jun 2026
Received by Isle of Wight
-
26 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Isle of Wight took a median of 57 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
25/01808/RVC Granted
Kingston Marine Park Saunders Way East Cowes Isle Of Wight
Variation of conditions 2 and 19 on 24/01137/FUL to allow for amendments to site layout including internal roadways and siting of reduced workshop buildings; drainage details
Documents
Plans, drawings, consultee responses and the officer's report
86 documents on file for this application
- SENIOR PLANNING ECOLOGY OFFICER
- MR JERRY WILLIS
- ENVIRONMENT AGENCY
- BNG METRIC
- SITE INVESTIGATION REPORTS - 15-65880 - KINGSTON MARINE PARK - FACTUAL REPORT_PA
- SITE INVESTIGATION REPORTS - 15-65880 - KINGSTON MARINE PARK - FACTUAL REPORT_PA
- SITE INVESTIGATION REPORTS - 15-65880 - KINGSTON MARINE PARK - FACTUAL REPORT_PA
- SITE INVESTIGATIONS REPORT - 15-65880 - KINGSTON MARINE PARK - FACTUAL REPORT_PA
- 23815 SOIL RESULTS WAC C
- 23815RP01 FINAL
- 23815 SOIL RESULTS WAC
- 731598 FACTUAL REPORT, KINGSTON MARINE PARK
- 731598 FACTUAL REPORT, KINGSTON MARINE PARK REV01
- GEOFIRMA SITE INVESTIGATION FEB 2013
- GEOFIRMA TESTING REPORT FEB 2013
- 10647-GIS116A-ADDITIONALSIPLAN
- BUND LOCATION PLAN_10647-SK352-D1
- GROUND ENGINEERING SI C13109 REPORT NOV 2013
- LQS FIGURE 1_SITELOCATIONPLAN
- LQS FIGURE 2_ANNOSITELAYOUT
- LQS FIGURE 3_DEVTPROPOSALS
- LQS FIGURE 4_HISTORICALFEATURES
- LQS FIGURE 5_SUPERFICIALDEPOSITSBASE
- LQS FIGURE 6A_CROSSSECTIONSAA
- LQS FIGURE 6B_CROSSSECTIONSBB
- LQS FIGURE 6C_CROSSSECTIONSCC
- LQS FIGURE 7_GRANULARSUPERFICIAL
- LQS FIGURE 8_UNDRAINED SHEAR STRENGTH & TRIAXIAL PLOT VS DEPTH
- LQS FIGURE 9_EXISTINGSERVICES
- 10647-GIS030A-SITEPHOTOS1-2
- 10647-GIS030A-SITEPHOTOS3
- 10647-GIS030A-SITEPHOTOS4
- 10647-GIS030A-SITEPHOTOS5-6
- 10647-GIS030A-SITEPHOTOS7-9
- RWRW10647-180311-PHOTOS
- GROUNDSURE_LEGEND
- EMS-99210-125285
- EMS-99210_125284
- 23815RP01 FINAL
- GW MONITORING 3
- GW MONITORING 2
- GW MONITORING 1
- GAS MONITORING 3
- GAS MONITORING 2
- GAS MONITORING 1
- LAND QUALITY STATEMENT
- GEOTECHNICAL DESIGN REPORT - APPENDIX A - FIGURES - 10647-C3000-D3 - PHASE 1 EXI
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES - IG 1 10647-GIS120A-LQSFIG1_SIT
- GEOTECHNICAL DESIGN REPORT - APPENDIX A - FIGURES - FIG2 10647-GIS118A-LQSFIG2_
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES - IG 3 10647-GIS119A-LQSFIG3_ANN
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES -FIG 4 - SPT VS DEPTH
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES - FIGURES - FIG 5 10647-GIS121A-
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES - FIG 6 & 7 STAB MODELS
- GEOTECHNICAL DESIGN REPORT - APPENDIX A FIGURES - FIG 6 & 7 STAB MODELS
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - HISTORICAL FACTUAL REPORTS - 1 RING SH
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - HISTORICAL FACTUAL REPORT - 15-64590-R
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - HISTORICAL FACTUAL REPORTS - 10647-CR
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - HISTORICAL FACTUAL REPORTS - RING SHEA
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - FACTUAL REPORT_PART 1
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - FACTUAL REPORT_PART 2
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - FACTUAL REPORT_PART 3
- GEOTECHNICAL DESIGN REPORT - APPENDIX B - FACTUAL REPORT_PART 4
- GEOTECHNICAL DESIGN REPORT - APPENDIX C - MLW-10647-KMP SITE PHOTOS 2016
- GEOTECHNICAL DESIGN REPORT - APPENDIX C - MLW-10647-KMP SITE PHOTOS 2016
- GEOTECHNICAL DESIGN REPORT - APPENDIX D - D2 GROUNDWATER MONITORING
- GEOTECHNICAL DESIGN REPORT - APPENDIX D - D2 GROUNDWATER MONITORING
- GEOTECHNICAL DESIGN REPORT - APPENDIX D - D1 SUMMARY GEOTECH TESTING
- GEOTECHNICAL DESIGN REPORT - APPENDIX D - D1 SUMMARY GEOTECH TESTING
- GEOTECHNICAL DESIGN REPORT - APPENDIX E - LAND QUALITY STATEMENT
- GEOTECHNICAL DESIGN REPORT - APPENDIX F - STABILITY OUTPUT
- GEOTECHNICAL DESIGN REPORT - APPENDIX F - STABILITY OUTPUT
- BACTEC UXO REPORT
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 1
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 2
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 3
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 4
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 5
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 6
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 7
- GEOTECHNICAL DESIGN REPORT - GDR SLOPE REMEDIATION F1_PART 8
- APPLICATIONFORMREDACTED
- ATTACHMENTSUMMARY
- NN1779R07-REV01 KINGSTON MARINE PARK E3S HMMP
- FIGURE SOFT LANDSCAPING
- BNG ASSESSMENT
- BIODIVERSITY_GAIN_PLAN
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Isle of Wight for determination, against a statutory target of eight weeks. Over the last year Isle of Wight's median decision took 57 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Isle of Wight's portal will say. Our guide explains the common types.