Planning application
Lower Hyde Holiday Park And Landguard Touring Area Landguard Road Shanklin Isle Of Wight
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Proposed construction of an internal vehicular link road between Landguard Holiday Park and Landguard Touring Area, including the upgrade of an existing pedestrian bridge to accommodate vehicular use and the provision of a managed crossing over an existing public bridleway; relocation and replacement footpath; widening of existing culvert/watercourse
As published by the council, reference 26/00750/FUL
Application record
- Reference
- 26/00750/FUL
- Category
- Full applications
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 2 Jun 2026
- Validated
- 23 Jun 2026
- Ward
- Shanklin Central
- Parish
- Shanklin
Timeline
Dates from the published record
-
2 Jun 2026
Received by Isle of Wight
-
23 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: P/00520/12 (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
- MR HILTON HARVEY-OBJECTS(FULL)
- MR OLIVER HARVEY-OBJECTS(FULL)
- MR JOHN HAGUE-NEUTRAL(FULL)
- MR ISLAND ROADS
- ENVIRONMENT AGENCY
- SOUTHERN WATER
- 4908(A)-100C - EXISTING SITE LOCATION PLAN
- SITE NOTICE
- MRS CAROLYN HERBERT
- 25057-DD-PP-0-01-REV0-PLANTING PLAN
- 4908(A)-320C - PROPOSED BRIDGE CROSSING
- RHE.4664 APPROXIMATE POST-DEVELOPMENT HABITAT MAP
- RHE.4664 BASELINE HABITAT MAP -
- BNG METRIC
- APPLICATIONFORMREDACTED
- ATTACHMENTSUMMARY
- 4908(A)-300B - PROPOSED SITE LOCATION PLAN
- 4908(A)-310B - PROPOSED BLOCK PLAN
- 4908(A)-315B - PROPOSED SITE PLAN
- 4908(A)-320B - PROPOSED BRIDGE CROSSING
- 4908(A)-325B - PROPOSED BRIDLEWAY CROSSING
- 4908(A)-110A - EXISTING BLOCK PLAN
- 4908(A)-115A - EXISTING SITE PLAN
- 4908(A)-120A - EXISTING BRIDGE CROSSING
- 4908(A)-125A - EXISTING BRIDLEWAY CROSSING
- DESIGN AND ACCESS STATEMENT 23-04-26 V1
- REP BS5837 TS AIA TPP AMS MJC-25-0168A REV0 LOWER HYDE LINK ROAD WEST 04 12 25
- 8100 FLOODING AND DRAINAGE ASSESSMENT REPORT
- 8100 TRANSPORT STATEMENT REVA 29-05-26
- RHE.4664 PEA AND BNG ASSESSMENT AT LANDGUARD HOLIDAY PARK - ISLE OF WIGHT 2026 R
- 4908. COVERING LETTER 01.06.26
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Isle of Wight decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Isle of Wight
-
26/01450/FUL Awaiting decision
Northwood House Ward Avenue Cowes Isle Of Wight PO31 8AZ
Proposed installation of 84 roof mounted solar panels on the west, east and south wings
-
26/01448/FUL Awaiting decision
Skinners Farmhouse Skinners Farm Pallance Road Northwood Cowes Isle Of Wight PO31 8LX
Demolition and replacement building to provide storage and a single bedroom unit of holiday accommodation
-
26/01434/FUL Awaiting decision
64 Forest Road Newchurch Sandown Isle Of Wight PO36 0JZ
Demolition of rear extension; Proposed two storey/single storey rear extension and new slate roof to existing dwelling; carport; replacement windows
-
26/01437/FUL Awaiting decision
Former Liberal Club 13 Denmark Road Cowes Isle Of Wight PO31 7SY
Repositioning of external staircase to first floor apartment from the south west elevation to the north east elevation; provision of security gate to new staircase; alterations to fenestration to north east elevation
-
26/01432/FUL Awaiting decision
Aldi Foodstore Ltd Brading Road Ryde Isle Of Wight PO33 1QG
Extension of the approved customer car park to provide 23 additional parking spaces, comprising a revised car park layout, associated landscaping and infrastructure works