Skip to content
PlanIndex Get alerts
Menu

Planning application

Four Seasons Latimer Road St Helens Ryde Isle Of Wight PO33 1TR

Granted Isle of Wight 23/00253/CLPUD LDC Proposed

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Lawful Development Certificate for proposed rear dormer window and roof windows

As published by the council, reference 23/00253/CLPUD

Application record

Reference
23/00253/CLPUD
Type
LDC Proposed
Status
Decided
Decision
Granted
Received
9 Feb 2023
Validated
9 Feb 2023
Decided
6 Apr 2023
Ward
Brading And St Helens
Parish
St. Helens
Decision by
Planning Officer Delegated Decision
Postcode
PO33 1TR

Timeline

Dates from the published record

  1. 9 Feb 2023

    Received by Isle of Wight

  2. 6 Apr 2023

    Decision issued: Granted

  3. 20 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Newport

61 applications on PlanIndex · across 3 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Pipers Cottage Hilbre Road St Helens Ryde Isle Of Wight PO33 1TJ

    25/01311/TW Submitted 9 Sep 2025 140m away

    Amendment to proposal (received 20.11.2025): T2; Oak - 20% reduction, back to good growth points; Remove the two lower most limbs growing east and south over the driveway of The Coach House (as previously granted in permission dated August 2017 under reference no TW-0271-17, but not undertaken at that time). T3; Oak. 20% reduction, back to good growth points.

    Granted Trees 5 docs
  • Oaktrees Mill Road St Helens Ryde Isle Of Wight PO33 1YH

    19/01317/DIS Submitted 28 Oct 2019 160m away

    Condition compliance application on 19/00652/HOU for condition 5 (arboreal method statement)

    Decided Conditions 4 docs
  • 43 Downs View Road St Helens Ryde Isle Of Wight PO33 1YE

    26/00520/TW Submitted 17 Apr 2026 166m away

    T1; Oak - Reduce over garden of 43 by approximately 40%. Reason Rebalance crown and reduce overhanging into garden. tree has been heavily reduced on one side previously so is very unbalanced.

    Granted Trees 4 docs
  • Former St Helens Service Station Lower Green Road St Helens Ryde Isle Of Wight PO33 1TH

    25/01388/FUL Submitted 19 Sep 2025 170m away

    Proposed conversion of former garage/workshop, with flat above into 4 residential units (revised plans) (readvertised application)

    Granted Full applications 15 docs
  • Christmas Cottage Newlands St Helens Ryde Isle Of Wight PO33 1TT

    24/01556/HOU Submitted 14 Oct 2024 171m away

    Demolition of two outbuildings; proposed single storey rear extension; alterations to include new windows in side elevation

    Granted Householder Extension Demolition +1 7 docs
    Small domestic
  • St Helens Mill Mill Road St Helens Ryde Isle Of Wight PO33 1YH

    26/00928/HOU Submitted 8 Jul 2026 174m away

    94% historically approved · decision due ~10 Sep

    Demolition of outbuilding; Proposed replacement outbuilding to form home office and gym; associated landscaping to include removal of slipway and reinstatement of coastal habitat

    Awaiting decision Householder Demolition 38 docs
    Small domestic

In Isle of Wight

  • 26/00731/16APA Granted

    Span Farm Radio Mast Stenbury Down Off Rew Lane Wroxall Isle Of Wight

    Prior approval for back up power diesel generator and all ancillary development

    1 Jun 2026 Outline
  • 26/00700/CLPUD Granted

    Devonia Norton Green Freshwater Isle Of Wight PO40 9RU

    Lawful Development Certificate for demolition of existing single storey rear extension; Proposed single storey rear extension

    22 May 2026 Outline
  • 26/00666/CLPUD Withdrawn

    Vayres Farm Whitcombe Road Newport Isle Of Wight PO30 3DY

    Lawful Development Certificate for installation of roof mounted solar panels on existing outbuilding

    18 May 2026 Outline
  • 26/00553/CLPUD Refused

    Unit 5 7 Riverway Newport Isle Of Wight PO30 5UX

    Lawful Development Certificate for proposed installation of four windows on side elevation, new roller shutter door on front elevation, replacement of old shutter door with door and window, new palisade fencing

    24 Apr 2026 Outline
  • 26/00644/16APA Granted

    Land Rear Of Woods Trade Supplies 24 Wilton Park Road Shanklin Isle Of Wight

    Prior approval for removal of existing 15m monopole with antennas atop (overall height 17m) and replacement with 18.58m high installation (including 12.38m high monopole) with 3 relocated antennas and 1 relocated dish; removal of existing cabinet and proposed cabinet and PSU within existing cabinet; installation of 6 new antennas, remote radio units (RRUs), break out boxes (BOBs), GPS node and associated apparatus and ancillary works (revised description).

    14 May 2026 Outline