Skip to content
PlanIndex Get alerts
Menu

Planning application

Glanynys, Tyddyn Mostyn, Porthaethwy / Glanynys, Tyddyn Mostyn, Menai Bridge

Decided Isle of Anglesey MAO/2026/33 PLANNING PORTAL - Non-Material Amendment

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio FPL/2024/228 er mwyn diwygio geiriad o Amodau 17 (Cynllun Rheoli Traffig Adeiladu) ac Amod 21 (Cynllun Rheoli Amgylcheddol Adeiladu) yn / Minor amendments to scheme previously approved under planning permission FPL/2024/228 so as to amend wording of Conditions 17 (Construction Traffic Management Plan) and Condition 21 (Construction Environmental Management Plan) at

As published by the council, reference MAO/2026/33

Application record

Reference
MAO/2026/33
Type
PLANNING PORTAL - Non-Material Amendment
Status
Valid
Decision
Heb Benderfyniad / Not yet determined
Received
7 Sep 2026
Validated
8 Sep 2026
Ward
Aethwy
Parish
Menai Bridge
Decision by
Dirprwyedig / Delegated

Site history

Applications at this address on the Isle of Anglesey register

This site has had 3 applications since 2026: 2 approved, 0 refused.

  • DIS/2026/38 Granted

    Glanynys, Tyddyn Mostyn, Porthaethwy / Glanynys, Tyddyn Mostyn, Menai Bridge

    Cais i ryddhau amodau (19) (Cynllun Teithio) a (22) (Deunyddiau Allanol) o ganiatâd cynllunio FPL/2024/228 ar dir ger / Application to discharge conditions (19) (Travel Plan) and (22) (External Materials) of planning permission FPL/2024/228 on land adjacent

    Decided 3 Sep 2026 Conditions
  • DIS/2026/31 Granted

    Glanynys, Tyddyn Mostyn, Porthaethwy / Glanynys, Tyddyn Mostyn, Menai Bridge

    Cais i ryddhau amod (12) (gwaith coed a gwrychoedd) o ganiatâd cynllunio FPL/2024/228 (codi cyfleuster gofal ychwanegol a chartref gofal preswyl gyda chyfleusterau cymunedol) ar dir ger / Application to discharge condition (12) (tree & hedgerow work) of planning permission FPL/2024/228 (erection of an extra care facility and residential care home with community facilities) on land adjacent

    Decided 8 Jun 2026 Conditions

Timeline

Dates from the published record

  1. 7 Sep 2026

    Received by Isle of Anglesey

  2. 8 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 16 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Isle of Anglesey has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

In Isle of Anglesey

  • VAR/2026/12 Granted

    Uned 2 a 3, Parc Manwerthu Penrhos, Caergybi / Units 2 & 3, Penrhos Retail Park, Holyhead

    Cais o dan Adran 73 i ddiwygio amod (02) (nwyddau a ganiateir) o ganiatâd cynllunio rhif 19C689D (adeiladu 6 uned fanwerthu di-fwyd, uned bwyd cyflym A3 a newid mynediad i gerbydau a cherddwyr) er mwyn diwygio geiriad yr amod i ehangu’r math o nwyddau a ganiateir yn / Application under Section 73 for the variation of condition (02) (permissible goods) of planning permission reference 19C689D (construction of 6 non-food retail units, an A3 fast food unit and alteration of vehicular and pedestrian access) so as to amend condition wording to expand the range of permissible goods at

    Received 27 Mar, published by the council 6 Aug 2026 Amendments
  • VAR/2026/16 Granted

    Pont Crug Uchaf, Llanddaniel.

    Cais o dan Adran 73A i ryddhau amodau (04) (Datganiad Dull Dymchwel), (07) (Cynllun Rheoli Traffig Adeiladu), a (08) (Triniaeth Ffin) o ganiatâd cynllunio rhif FPL/2021/203 (dymchwel adeilad presennol a codi annedd newydd) yn / Application under Section 73A for the discharge of conditions (04) (Demolition Method Statement), (07) (Construction Traffic Management Plan), and (08) (Boundary Treatment) of planning permission reference FPL/2021/203 (demolition of existing building and erection of replacement dwelling) at

    Received 21 Apr, published by the council 6 Aug 2026 Amendments
  • VAR/2026/14 Granted

    A5025 rhwng y Gyffordd ar yr A5 i’r Dwyrain o’r Fali i’r Orsaf Bwer yng Nghemaes / A5025 between A5 East of Valley Junction to Power Station Cemaes

    Cais Adran 73 i amrywio amod (01) (Terfyn Amser) o gais VAR/2023/41 (Gwella’r briffordd gyfredol (yr A5025) rhwng y gyffordd ar yr A5 i’r dwyrain o’r Fali i’r Gyffordd wrth y Ffordd Fynediad i’r Orsaf Bwer arfaethedig mewn wyth o leoliadau ar wahân ynghyd ag ailadeiladu a lledu’r pafin presennol a’r gorffenwaith ar yr arwynebedd mewn mannau, gweithredu compownd adeiladu dros dro gan gynnwys cyfleuster dros dro ar gyfer ailgylchu pafinau, creu dau bwll teneuo a mynedfa ar gyfer cynnal a chadw, creu llwybrau beicio a gwyro rhai eraill am gyfnod dros dro, creu cyfleusterau parcio eraill yn sgil colli cilfan ynghyd â gwaith cysylltiedig arall gan gynnwys draenio, trin ffiniau, plannu, gosod arwyddion newydd a marciau ar hyd yr) er mwyn ymestyn cyfnod gweithredu’r datblygiad am dair blynedd arall ar hyd yr / Section 73 application to vary condition (01) of application VAR/2023/41 (Improvements to the existing highway (A5025) between A5 East of Valley Junction to the proposed Power Station Access Road Junction at eight separate locations together with reconstruction and localised widening of existing pavement and surface dressing, temporary construction compound including temporary pavement recycling facility, creation of 2 attenuation ponds and maintenance access, creation/temporary diversion of cycle routes, creation of alternative parking facilities to mitigate loss of lay by together with other associated works including drainage, boundary treatments, planting, new signage and road markings) so as to extend the implementation period of the development by a further three years along the

    Received 10 Apr, published by the council 6 Aug 2026 Amendments
  • VAR/2026/13 Granted

    Wylfa, Cemaes

    Cais o dan Adran 73 i ddiwygio amod (01) (cynllun tynnu ac ail-osod) o ganiatâd cynllunio rhif VAR/2022/39 (diwygio amod (01) o gais 38C310E er mwyn caniatau estyniad 12 mis) er mwyn ymestyn hyd y caniatâd am gyfnod o bedair blynedd yn / Application under Section 73 for the variation of condition (01) (removal and re-instatement scheme) of planning permission reference VAR/2022/39 (variation of condition (01) of 38C310E to allow 12 month extension) so as to extend the duration of the permission by a period of four years at

    Received 9 Apr, published by the council 6 Aug 2026 Amendments
  • MAO/2026/12 Refused

    Haulfryn, Scotland Terrace, Bodffordd

    Mân newidiadau i gynllun sydd wedi ei ganiatáu yn flaenorol o dan caniatád cynllunio FPL/2023/15 er mwyn diwygio'r dyluniad a geiriad amod (12)(Amodau mynediad) a (14) (cynlluniau a ganiatawyd) yn / Minor amendments to scheme previously approved under planning permission FPL/2023/15 so as to amend the design and the wording of condition 12 (Access conditions) and (14) (approved plans) at

    Received 20 Apr, published by the council 6 Aug 2026 Amendments