Planning application
Land At Former IBM Site Spango Valley Inverkip Road Greenock
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed mixed-use development comprising residential, industrial/business use, retail & leisure use and park & ride with associated roads infrastructure, access, open space, landscaping and drainage
As published by the council, reference 20/0021/IC
Application record
- Reference
- 20/0021/IC
- Type
- Planning Permission in Principle
- Status
- Granted Subject To Conditions
- Decision
- Granted As published: granted subject to conditions
- Received
- 10 Feb 2020
- Validated
- 10 Feb 2020
- Decided
- 7 Mar 2022
- Ward
- Ward 6 - Inverclyde South West
- Parish
- Inverkip/Wemyss Bay Community Council
- Decision by
- Committee
Site history
Applications at this address on the Inverclyde register
This site has had 2 applications since 2020: 2 approved, 0 refused.
-
22/0225/IC Granted
Land At Former IBM Site Spango Valley Inverkip Road Greenock
Amendment to condition 4 of Planning Permission in Principle 20/0021/IC for a proposed mixed-use development comprising residential, industrial/business use, retail & leisure use and park & ride with associated roads infrastructure, access, open space, landscaping and drainage to increase the number of permitted residential dwellings from 270 to 450 (Section 42 application)
Timeline
Dates from the published record
-
10 Feb 2020
Received by Inverclyde
-
7 Mar 2022
Decision issued: granted subject to conditions
-
14 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Advance Construction (GD) Ltd. Applicant, a construction firm
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
121 documents on file for this application
Drawings (10)
- Approved proposed ramp modification
- Approved proposed signalling design option 1
- Approved indicative masterplan
- Approved land use plan
- Approved parameter plan
- Approved parameter plan
- Approved parameter plan
- Approved parameter plan
- Approved phasing plan
- Approved location plan
Everything on file (121)
- Granted Subject to Conditions
- Linked Network Full input Data
- ROAD SAFETY REVIEW
- Full Input Data and Results
- STAGE 1 ROAD SAFETY AUDIT REPORT
- APPROVED Proposed Ramp Modification
- APPROVED Proposed Signalling Design Option 1
- Access Strategy Note
- Grade Seperated Junction Review
- IGIR - Part 1
- IGIR - Part 10
- IGIR - Part 11
- IGIR - Part 12
- IGIR - Part 13
- IGIR - Part 14
- IGIR - Part 15
- IGIR - Part 16
- IGIR - Part 17
- IGIR - Part 18
- IGIR - Part 19
- IGIR - Part 2
- IGIR - Part 20
- IGIR - Part 21
- IGIR - Part 22
- IGIR - Part 23
- IGIR - Part 24
- IGIR - Part 25
- IGIR - Part 26
- IGIR - Part 27
- IGIR - Part 28
- IGIR - Part 29
- IGIR - Part 3
- IGIR - Part 30
- IGIR - Part 31
- IGIR - Part 32
- IGIR - Part 33
- IGIR - Part 34
- IGIR - Part 35
- IGIR - Part 36
- IGIR - Part 37
- IGIR - Part 38
- IGIR - Part 39
- IGIR - Part 4
- IGIR - Part 40
- IGIR - Part 41
- IGIR - Part 42
- IGIR - Part 43
- IGIR - Part 44
- IGIR - Part 45
- IGIR - Part 46
- IGIR - Part 5
- IGIR - Part 6
- IGIR - Part 7
- IGIR - Part 8
- IGIR - Part 9
- Energy Statement
- EIA Report Vol 2 - Updated Flood Risk Assessment part 1
- EIA Report Vol 2 - Updated Flood Risk Assessment part 2
- EIA Report Vol 2 - Updated Flood Risk Assessment part 3
- EIA Report Vol 2 - Updated Flood Risk Assessment part 4
- EIA Report Vol 2 - Updated Flood Risk Assessment part 5
- EIA Report Vol 2 - Updated Flood Risk Assessment part 7
- EIA Report Vol 2 - Updated Flood Risk Assessment part 6
- EIA Report Vol 2 - Updated Flood Risk Assessment part 8
- EIA Report Vol 2 - Updated Flood Risk Assessment part 9
- EIA Report Vol 2 - Updated Flood Risk Assessment part 10
- EIA Report Vol 2 - Updated Flood Risk Assessment part 11
- Design and Access Statement - Part 1
- Design and Access Statement - Part 2
- Design and Access Statement - Part 3
- EIA Report NTS Part 1
- EIA Report NTS Part 2
- APPROVED Indicative Masterplan
- APPROVED Land Use Plan
- APPROVED Location Plan
- Market Report
- PAC Report
- APPROVED Parameter Plan - Access
- APPROVED Parameter Plan - Drainage
- APPROVED Parameter Plan - Heights
- APPROVED Parameter Plan - Roads
- APPROVED Phasing Plan
- Planning Statement
- Planning Permission in Principle
- EIA Report Vol 1 - Introduction and Location Plan
- EIA Report Vol 1 - Methodology
- EIA Report Vol 1 - Site and Development Description
- EIA Report Vol 1 - Alternatives
- EIA Report Vol 1 - Construction
- EIA Report Vol 1 - Transport
- EIA Report Vol 1 - Water Resources and Flood Risk
- EIA Report Vol 1 - Ground Conditions
- EIA Report Vol 1 - Biodiversity
- EIA Report Vol 1 - Noise and Vibration
- EIA Report Vol 1 - Air Quality
- EIA Report Vol 1 - Landscape and Visual Part 1
- EIA Report Vol 1 - Landscape and Visual Part 2
- EIA Report Vol 1 - Landscape and Visual Part 3
- EIA Report Vol 1 - Population and Human Health
- EIA Report Vol 1 - Summary
- EIA Report Vol 1 - Main Text and Figures
- EIA Report Vol 2 - Scoping Correspondance
- EIA Report Vol 2 - Sensitivity Analysis
- EIA Report Vol 2 - Drainage Strategy Report
- EIA Report Vol 2 - Bat Activity Survey
- EIA Report Vol 2 - National Vegetation Classification Survey
- EIA Report Vol 2 - Tree Survey
- EIA Report Vol 2 - Noise Impact Assessment
- EIA Report Vol 2 - Air Quality Assessment Technical Report
- EIA Report Vol 2 - Landscape and Visual Methodology
- EIA Report Vol 2 - Landscape Policy
- EIA Report Vol 2 - Landscape & Townscape Effects Tables
- EIA Report Vol 2 - Visual Effects Tables
- EIA Report Vol 2 - Site Appraisal and Site Context Photos
- EIA Report Vol 2 - Appendices Contents Page
- EIA Report Vol 2 - Location of Info Within EIA Report
- EIA Report Vol 2 - Statement of Expertise
- EIA Report Vol 2 - Scoping Opinion
- EIA Report Vol 2 - Transport Assessment
- EIA Report Vol 2 - Initial Geological Mining and Environmental Appraisal
- PRELIMINARY ECOLOGICAL APPRAISAL
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Inverclyde granted permission on 7 March 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Inverclyde
-
26/0118/IC Granted
Workshop 3 Highholm Street Port Glasgow PA14 5HG
Housing development of 12 flats with 12 on-site parking spaces on ground floor (planning permission in principle) (renewal of previous consent 23/0218/IC)
-
26/0051/IC Awaiting decision
Glenfield 1 Bedford Street Greenock PA16 8PG
Erection of 19 Dwellings; including a mix of flats (16 units within a 3-storey building) and terraced townhouses (3 units over 3 storeys) together with associated works including access, parking, garden ground and landscaping. To follow Demolition of the former Glenfield Care Home (reference: 26/0003/CC).
-
24/0261/IC Refused
Gap Site Adjacent Point Place Main Street Inverkip PA16 0AX
Erection of dwellinghouse
-
24/0246/IC Granted
Valleyview House 396 Dougliehill Road Port Glasgow PA14 5XF
Erection of dwellinghouse and domestic garage (planning permission in principle)
-
23/0053/IC Granted
The Bell House Langhouse Road Inverkip PA16 0DE
Proposed erection of detached dwelling house within the grounds of the Bell House (planning permission in principle)