Skip to content
PlanIndex Get alerts
Menu

Planning application

Mast South West Of Building 401 RAF Molesworth High Street Molesworth

Granted Huntingdonshire 26/80116/COND Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 7 (details of auxiliary support buildings) of 22/00011/REM

As published by the council, reference 26/80116/COND

Application record

Reference
26/80116/COND
Category
Conditions
Status
Approved
Decision
Granted As published: Approved
Received
29 Apr 2026
Validated
29 Apr 2026
Decided
2 Jul 2026
Ward
Kimbolton
Parish
Brington And Molesworth

Site history

Applications at this address on the Huntingdonshire register

This site has had 7 applications since 2021: 6 approved, 0 refused.

  • 26/80078/COND Granted

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Discharge of condition 6 (ventilation details) of 19/02509/OUT

    Decided 27 Jul 2026 Conditions
  • 25/80265/COND Granted

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Discharge of Condition 15 (external lighting scheme) of 19/02509/OUT.

    Decided 17 Oct 2025 Conditions
  • 25/80232/COND Granted

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Discharge of Condition 6 (Hard & Soft Landscaping) of 22/00011/REM

    Decided 2 Apr 2026 Conditions
  • 25/80141/COND Granted

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Discharge of condition 5 (SWD scheme) of 19/02509/OUT

    Decided 2 Apr 2026 Conditions
  • 22/00194/REM Granted

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Application for the approval of reserved matters for the construction of a two storey office accommodation building (including entry facility, loading dock and warehouse), associated car parking and associated development including plant and machinery, substation and landscaping pursuant to conditions 1, 7, 8, 9, 11, 12, 13, 14, 16 and 17 following approval of application reference 19/02509/OUT

    Decided 9 Feb 2023 Reserved matters
  • 22/80005/COND Withdrawn

    Mast South West Of Building 401 RAF Molesworth High Street Molesworth

    Conditional Information for 19/02509/OUT: C5 (Surface Water Drainage Scheme)

    Decided 27 Apr 2023 Conditions

Timeline

Dates from the published record

  1. 29 Apr 2026

    Received by Huntingdonshire

  2. 2 Jul 2026

    Decision issued: Approved

  3. 23 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 22/00011/REM (Approved)

What this grant of permission means

Huntingdonshire granted permission on 2 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Huntingdonshire

  • 26/80238/COND Granted

    Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB

    Discharge of condition 18 (Preconstruction Bat Survey) of 25/01922/OUT

    Received 9 Sep, published by the council 11 Sep 2026 Conditions
  • 26/80248/COND Granted

    Brookfield Farm Ermine Street Great Stukeley Huntingdon PE28 4AB

    Discharge of Condition 44 (Contamination site investigations) of 25/01922/OUT (Outline Planning Application with all matters reserved except for site access for construction of Storage and Distribution (Use Class B8), General Employment (Use Class B2), Bus Depot (Sui Generis) floorspace with ancillary offices and gatehouses, provision of landscaping, access infrastructure (including new and improved vehicular access from the A141, highway, parking, cycle and pedestrian access), utilities (including gas, electricity, water, sewerage, telecommunications), sustainable drainage systems, and all associated engineering works (including demolition of existing structures and buildings, breaking-up and reuse of hardstanding and ground remodelling and enabling works). The proposed development is phased with each phase being a separate and severable part of the development.)

    Received 1 Oct, published by the council 5 Oct 2026 Conditions
  • 26/80271/COND Awaiting decision

    13 Berkley Street Eynesbury St Neots PE19 2NB

    Discharge of condition 3 (sample of materials required) and 4 (rooflight details) of 26/00400/HHFUL

    Received 2 Nov, published by the council 4 Nov 2026 Conditions
  • 26/80242/COND Granted

    1 The Glade The Boulevard Enterprise Campus Alconbury Weald Huntingdon PE28 4XA

    Discharge of condition 3 (Plant & Machinery) of 24/02038/FUL

    Received 18 Sep, published by the council 22 Sep 2026 Conditions
  • 26/80208/COND Granted

    3 The Avenue Godmanchester Huntingdon PE29 2AF

    Dicharge of condition 3 (Schedule of Works) of 25/01266/LBC. Please see survey of the existing ironmongery in drawings 316-C3-01 to 20. Proposed Schedule of Works and justification for replacement ironmongery in document 316-C3-100.

    Received 12 Aug, published by the council 17 Aug 2026 Conditions