Skip to content
PlanIndex Get alerts
Menu

Planning application

Cemetery School Lane Fenstanton

Granted Huntingdonshire 25/01928/TRCA

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Lime Trees Tree 1 needs to be felled and poison stump with salt, Tree 4 to reduce to approx 7ft due to fungal growth and a split in the trunk.

As published by the council, reference 25/01928/TRCA

Application record

Reference
25/01928/TRCA
Status
Approved
Decision
Approved
Received
6 Oct 2025
Validated
21 Nov 2025
Decided
29 Dec 2025

Site history

Applications at this address on the Huntingdonshire register

This site has had 6 applications since 2022: 3 approved, 0 refused.

  • 25/01628/TRCA Decided

    Cemetery School Lane Fenstanton

    Oak tree lift the crown and reduce the lateral limbs by 2-3 ft.

    Submitted 27 Aug 2025
  • 25/01608/TRCA Decided

    Cemetery School Lane Fenstanton

    Lime trees - pollarding top and bottom up to 1 metre.

    Submitted 22 Aug 2025
  • 24/01899/TRCA Granted

    Cemetery School Lane Fenstanton

    Oak - crown lift by 1.8m

    Decided 12 Nov 2024 Trees
  • 24/01872/TRCA Granted

    Cemetery School Lane Fenstanton

    The Lime trees require their annual pollarding top and bottom. The hedges need approx. 1/2 meters off height and trimmed back 1/4 meters

    Decided 11 Oct 2024 Trees
  • 22/01644/TRCA Decided

    Cemetery School Lane Fenstanton

    Lime Trees Along the pathway through the Cemetery and along the front of the Church boundary - Prune trunk and top new growth by appox 1m Conifer - Prune brances by approx 1.5m

    Decided 8 Feb 2023 Trees

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Huntingdonshire

  2. 21 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Dec 2025

    Decision issued: Approved

  4. 7 Aug 2026

    Added to PlanIndex

What this grant of permission means

Huntingdonshire granted permission on 29 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Huntingdonshire's portal will say. Our guide explains the common types.