Planning application
Land East Of Weston Farm Great Drove Yaxley
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection Of Ancillary Office And Administration Building.
As published by the council, reference 19/01641/FUL
Application record
- Reference
- 19/01641/FUL
- Type
- Full Planning Application
- Status
- Approved
- Decision
- Grant Permission to
- Received
- 16 Aug 2019
- Validated
- 2 Sep 2019
- Decided
- 20 Nov 2020
- Ward
- Yaxley
- Parish
- Yaxley
- Decision by
- Delegated
Timeline
Dates from the published record
-
16 Aug 2019
Received by Huntingdonshire
-
2 Sep 2019
Validated
Checked as complete and ready for consideration.
-
20 Nov 2020
Decision issued: Grant Permission to
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
33 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Produce World Group Ltd Great Drove Yaxley Peterborough PE7 3TW
Conditional Information for 19/00379/NMA: C1 (HGV Management Plan)
Decided Conditions 5 docs -
Land South West Of Great Drove Yaxley
84% historically approved · decision due ~19 May
Change of use from grading and storage of farm produce to B2 (General Industrial) and B8 (Storage or Distribution).
Awaiting decision Full applications 20 docs -
8 Mulberry Close Yaxley Peterborough PE7 3HB
92% historically approved · decision due ~29 Apr
Lawful development certificate for proposed change of use of garage to extra bedroom and bathroom.
Decided -
14 Mulberry Close Yaxley Peterborough PE7 3HB
92% historically approved · decision due ~26 Dec
Variation of Condition 2 (Approved plans) of 22/00231/HHFUL to allow change of the position of kitchen doors and window and erection of revised front porch. (Retrospective)
Decided Extension Windows or glazingSmall domestic -
Land South West Of 1 Main Street Yaxley
84% historically approved · decision due ~26 May
Erection of 77 dwellings and demolition of two buildings.
Awaiting decision Full applications Demolition 225 docsMajor scheme -
33 Peartree Walk Yaxley Peterborough PE7 3HQ
Proposed two storey front extension
Granted Householder Extension 5 docsDomestic
Other full applications applications
In Huntingdonshire
-
26/00381/FUL Withdrawn
20 Halcyon Court Huntingdon PE29 6DG
Change of use from Class B2/B8/E(g)(iii) to hot food takeaway. Install extraction equipment and flue to roof.
-
25/01722/FUL Granted
Land South Of Broad Drove And East Of Mile Drove Yaxley
Erection of new storage barn and change of use for storage of agricultural materials
-
26/01586/FUL Awaiting decision
25 Huntingdon Street St Neots PE19 1BG
Change of use of the existing hot food takeaway (Sui Generis) to mixed use restaurant (Use Class E(b)) with 9 customer seats, while retaining takeaway service (Sui Generis)
-
26/01064/FUL Granted
Land West Of Cambridgeshire Constabulary Hinchingbrooke Park Road Huntingdon
Drilling of a single exploratory borehole (approx 15cm diameter) and installation of equipment to undertake thermal response testing for Ground Source Heat Pump array
-
26/01140/FUL Granted
15 Blackstone Road Huntingdon PE29 6EF
Change of Use to General Industrial Use including installation of MOT Testing Facility and Spray Booth (B8)