Planning application

Westward House Bury Road Ramsey Huntingdon PE26 1NA

Granted Huntingdonshire 19/01012/S73 Removal/Variation of Conditions

Works: New dwelling Extension Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Amendment to condition 2 of 18/00948/FUL - new plans for creation of a new build care home (Use Class C2) and associated car parking and landscaped gardens for residents requiring nursing, dementia and residential care following the demolition of the 1970s extension to Westward House. The amendments include internal alterations to the retained Victorian dwelling to allow for change of use to Use Class C2 to provide ancillary accommodation to the new care home, such as staff accommodation, staff facilities and resident amenities space

As published by the council, reference 19/01012/S73

Application record

Reference
19/01012/S73
Type
Removal/Variation of Conditions
Status
Approved
Decision
Grant Permission to
Received
17 May 2019
Validated
17 May 2019
Decided
16 Aug 2019
Ward
Ramsey
Parish
Ramsey
Decision by
Delegated
Postcode
PE26 1NA

Timeline

Dates from the published record

  1. 17 May 2019

    Received by Huntingdonshire

  2. 16 Aug 2019

    Decision issued: Grant Permission to

  3. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About amendments applications

How this application type works

An amendment application changes a permission that already exists. Non-material amendments cover small adjustments with no wider effect, while minor material amendments, usually made by varying a condition, allow modest design changes without a fresh application. Anything beyond that needs a new permission, so the scope here is deliberately narrow.

More on amendments applications in our guide

Nearby applications

Within 500 metres

  • 1 Biggin Lane Ramsey Huntingdon PE26 1NB

    24/00495/OUT Submitted 15 Mar 2024 58m away

    Demolition of existing dwelling for replacement dwelling (all matter reserved)

    Granted Outline Demolition 23 docs
    Domestic
  • Orchard House Bury Road Ramsey Huntingdon PE26 1NA

    24/01529/TRCA Submitted 22 Aug 2024 75m away

    T2 Cherry Laurel - Remove low branch overhanging house

    Granted Trees 5 docs
  • 2 Biggin Lane Ramsey Huntingdon PE26 1NB

    22/02403/TRCA Submitted 22 Nov 2022 89m away

    T1 Silver Birch - Fell to ground level due to cracking in the front of the property and root damage to the driveway and footpath. T2 Willow - Reduce the crown overall by 3m to create more light in the back garden.

    Split decision Trees 2 docs
  • Westward House Bury Road Ramsey Huntingdon PE26 1NA

    26/01440/FUL Submitted 7 Aug 2026 105m away

    84% historically approved · decision due ~6 Oct

    Change of use to a SEN day school (Class F1), erection of a rear single storey extension, external alterations to existing two-storey rear extension, and associated works including additional car parking, new landscaping, and recreation areas

    Awaiting decision Full applications Extension
    Small domestic
  • 4 Biggin Lane Ramsey Huntingdon PE26 1NB

    24/02256/TRCA Submitted 2 Dec 2024 112m away

    T1 Ash - re-reduce by up to 3m T2 - Ash - leaning - fell

    Decided Trees 2 docs
  • 10 Biggin Lane Ramsey Huntingdon PE26 1NB

    24/01460/TRCA Submitted 13 Aug 2024 129m away

    T1 Box Elder - Re-shape and re-balance canopy by 3m, Thin canopy where necessary, 1m clear from telephone wires.

    Granted Trees 3 docs

In Huntingdonshire

  • 26/01515/NMA Awaiting decision

    Waitrose Ltd Priory Lane St Neots PE19 2BH

    Non-material amendment of 26/00532/FUL to change from arched roof edge protection rails to uprights set at 1800mm spacings to match the glazing module below

    18 Aug 2026 Amendments
  • 26/01374/NMA Awaiting decision

    Clover Church Causeway Sawtry Huntingdon PE28 5TD

    Non Material Amendment of 25/01761/FUL to allow for the replacement of the double doors with a window, removal of window and alterations to the main entrance door design, and the installation of a pitched roof element above the main entrance.

    28 Jul 2026 Amendments
  • 26/01382/NMA Awaiting decision

    David Lloyd Club Nuffield Road St Neots PE19 0DR

    Non Material Amendment to 24/01333/FUL to amend Condition 27 (HMMP Completion Report) to allow the submission of the HMMP Completion Report after opening.

    28 Jul 2026 Amendments
  • 26/01296/NMA Awaiting decision

    30 Elm Close Huntingdon PE29 7AS

    Non material amendment to 25/01396/HHFUL to amend the size of extension

    17 Jul 2026 Amendments
  • 26/01214/NMA Awaiting decision

    Alconbury Airfield Ermine Street Little Stukeley PE28 4WX

    Non-material amendment to Reserved Matters Approval ref. 23/00695/REM to substitute housetypes to plots 135 to 144, and revised fenestration and internal arrangements to plots 155, 157 and 159

    3 Jul 2026 Amendments