Planning application
Land At 93 Desborough Road Hartford
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part-demolition of existing double garage and construction of new dwelling-house, including amenity and revised vehicular access
As published by the council, reference 19/00679/FUL
Application record
- Reference
- 19/00679/FUL
- Type
- Full Planning Application
- Status
- Approved
- Decision
- Granted As published: Grant Permission to
- Received
- 1 Apr 2019
- Validated
- 1 Apr 2019
- Decided
- 14 Jun 2019
- Ward
- Huntingdon East
- Parish
- Huntingdon
- Decision by
- Delegated
Timeline
Dates from the published record
-
1 Apr 2019
Received by Huntingdonshire
-
14 Jun 2019
Decision issued: Grant Permission to
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Huntingdonshire granted permission on 14 June 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
99 Sapley Road Hartford Huntingdon PE29 1YU
2x Leyandii on road side of property - remove due to subsidence caused to driveway. Low amenity trees, poor planting decision.
Withdrawn Trees 3 docs -
95 Desborough Road Hartford Huntingdon PE29 1SP
Discharge of conditions 1 (Time Limit - 3 years), 2 (Accordance with Approved Plans), 5 (Floor Levels), 8 (Obscure Glazing), 10 (Accessible and Adaptable), 11 (Water Efficiency), 12 (Vehicular Access) of planning permission 20/00137/FUL
Withdrawn Conditions Windows or glazing -
95 Desborough Road Hartford Huntingdon PE29 1SP
Non-material amendment of 20/00137/FUL to allow change to approved external cladding colour
Granted Amendments -
75 Desborough Road Hartford Huntingdon PE29 1SP
Proposed removal of flat roofed garage, kitchen and entrance lobby and replacement with pitched tiled roofed extensions
Granted Extension -
26 Owl Way Hartford Huntingdon PE29 1YZ
Single storey front porch extension, single storey rear extension & dormer loft conversion
Granted Householder Extension Loft or dormer 26 docsSmall domestic -
9 Pennington Road Hartford Huntingdon PE29 1QA
First floor storey side, single storey rear extension and garage conversion
Granted Householder Extension 20 docsSmall domestic
Other full applications
In Huntingdonshire
-
26/01048/FUL Refused
Fields View Fenstanton Road Hilton PE28 9JA
Demolition of the existing cattery and kennels buildings and the erection of 4 detached dwellings, together with associated works including access and infrastructure
-
26/01472/FUL Granted
Stonely House 37 Main Road Stonely St Neots PE19 5EH
Partial rebuild of rear extension and repositioning of first floor window
-
26/00684/FUL Granted
6 Broadway Shopping Centre Malting Square Yaxley Peterborough PE7 3JJ
Conversion of first-floor storage unit to self-contained residential flat
-
26/01252/FUL Granted
Blue Diamond Banks End Wyton Huntingdon PE28 2AA
Change of use of land from a car wash and valet facility (approved under 15/01059/FUL) to an outdoor adventure golf course ancillary to Blue Diamond Garden Centre (Retrospective)
-
26/00921/FUL Granted
3 Redwongs Way Huntingdon PE29 7HF
2no proposed single storey extensions: Staging area/Dock Shelter to front elevation incorporating a 2no HGV docking stations. Air lock to front elevation and access into adjacent existing yard area. 1no lean to shelter construction for forklift charging. Replacement of existing pedestrian door along NE facing elevation. New reinforced concrete slab area within existing yard to site IBC's on top. Reconfiguration of waste storage within the yard, with addition of 1no closed compactor skip.