Planning application
Flock Farm Glatton Ways Glatton
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retention of building for use as tourist accommodation/holiday lets- AMENDED DESCRIPTION
As published by the council, reference 16/01359/FUL
Application record
- Reference
- 16/01359/FUL
- Type
- Full Planning Application
- Status
- Approved
- Decision
- Granted As published: Grant Permission to
- Received
- 28 Jul 2016
- Validated
- 28 Jul 2016
- Decided
- 13 Oct 2017
- Ward
- Sawtry
- Parish
- Glatton
- Decision by
- Delegated
Timeline
Dates from the published record
-
28 Jul 2016
Received by Huntingdonshire
-
13 Oct 2017
Decision issued: Grant Permission to
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Huntingdonshire granted permission on 13 October 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
1 Glatton Ways Glatton Huntingdon PE28 5RS
DD TRCA: Willow fell due to roots affecting sewers and possibly causing minor subsidence
Granted Trees 2 docs -
The Limes Glatton Ways Glatton Huntingdon PE28 5RS
Two lime trees. Customer has requested a heavy reduction down to the first main union of each tree/by 12 metres
Decided Trees 2 docs -
The Limes Glatton Ways Glatton Huntingdon PE28 5RS
Proposed new site entrance gates, new front door canopy, annexe extension linking existing garage to dwelling to the rear/side, family room extension to side, solar roof panels and conservation roof lights, air source heat pump installation.
Refused Householder Extension Loft or dormer 25 docsDomestic -
Barn House Glatton Ways Glatton Huntingdon PE28 5RS
Demolition of an existing conservatory and the erection of a single storey garden room
Granted Householder Extension Demolition 9 docsSmall domestic -
The Cedars Sawtry Road Glatton Huntingdon PE28 5RZ
90% historically approved · decision due ~14 Dec
Group 1 ( x3 ash trees, x3 purple plum) to be removed and stumps ground out.
Awaiting decision Trees -
Roundhills Farm Sawtry Road Glatton Huntingdon PE28 5RZ
90% historically approved · decision due ~17 Nov
Change of use of agricultural buildings to flexible commercial use (General Permitted Development Order Part 3 Class R) - Use Class B8
Awaiting decision
Other full applications
In Huntingdonshire
-
26/01048/FUL Refused
Fields View Fenstanton Road Hilton PE28 9JA
Demolition of the existing cattery and kennels buildings and the erection of 4 detached dwellings, together with associated works including access and infrastructure
-
26/01472/FUL Granted
Stonely House 37 Main Road Stonely St Neots PE19 5EH
Partial rebuild of rear extension and repositioning of first floor window
-
26/00684/FUL Granted
6 Broadway Shopping Centre Malting Square Yaxley Peterborough PE7 3JJ
Conversion of first-floor storage unit to self-contained residential flat
-
26/01252/FUL Granted
Blue Diamond Banks End Wyton Huntingdon PE28 2AA
Change of use of land from a car wash and valet facility (approved under 15/01059/FUL) to an outdoor adventure golf course ancillary to Blue Diamond Garden Centre (Retrospective)
-
26/00921/FUL Granted
3 Redwongs Way Huntingdon PE29 7HF
2no proposed single storey extensions: Staging area/Dock Shelter to front elevation incorporating a 2no HGV docking stations. Air lock to front elevation and access into adjacent existing yard area. 1no lean to shelter construction for forklift charging. Replacement of existing pedestrian door along NE facing elevation. New reinforced concrete slab area within existing yard to site IBC's on top. Reconfiguration of waste storage within the yard, with addition of 1no closed compactor skip.