Skip to content
PlanIndex Get alerts
Menu

Planning application

Building 12, Chiswick Business Park, 566 Chiswick High Road, Chiswick, London, W4 5AN

Granted Hounslow P/2025/3186 PF-Full Applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of a enclosed backup generator within the undercroft of the existing building.

As published by the council, reference P/2025/3186

Application record

Reference
P/2025/3186
Type
PF-Full Applications
Status
Decided: APPROVED
Decision
APPROVED
Received
22 Oct 2025
Validated
24 Oct 2025
Decided
23 Dec 2025
Ward
Chiswick Gunnersbury
Postcode
W4 5AN

Timeline

Dates from the published record

  1. 22 Oct 2025

    Received by Hounslow

  2. 24 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Dec 2025

    Decision issued: APPROVED

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 566 Chiswick Park, Building 12,Chiswick High Road,Chiswick,London,Hounslow,W4 5AN

    P/2024/2530 Submitted 26 Jul 2024 0m away

    Installation of replacement mechanical plant with associated pipework and cabling to the four storey commercial building's flat roof.

    Granted Full applications 27 docs
  • Building 1,Chiswick Business Park,566 Chiswick High Road,W4 5AN

    P/2026/2237 Submitted 31 Jul 2026 2m away

    65% historically approved · decision due ~25 Sep

    Reconfiguration of the existing undercroft area to create end of trip facilities, including the conversion of five existing car parking spaces, associated internal alterations, and the removal of redundant plant rooms.

    Awaiting decision Full applications 15 docs
  • Building 1, Chiswick Business Park 566 Chiswick High Road W4 5AN

    263009CONS Submitted 4 Aug 2026 2m away

    Reconfiguration of the existing undercroft area to create end of trip facilities, including the conversion of five existing car parking spaces, associated internal alterations, and the removal of redundant plant rooms (Out of Borough Consultation from L.B Hounslow)

    Granted Outline 2 docs
  • Building 1, Chiswick Business Park 566 Chiswick High Road W4 5AN

    263009CONS Submitted 4 Aug 2026 2m away

    87% historically approved · decision due ~29 Sep

    Reconfiguration of the existing undercroft area to create end of trip facilities, including the conversion of five existing car parking spaces, associated internal alterations, and the removal of redundant plant rooms (Out of Borough Consultation from L.B Hounslow)

    Awaiting decision 2 docs
  • Telecommunications Monopole Adjacent 389 Chiswick High Road, Chiswick, London, W4 4AL

    PA/2026/0941 Submitted 23 Mar 2026 99m away

    Prior Approval for the removal of an existing eleven metre high telecommunications pole (with one antenna) and three existing equipment cabinets and installation of a twenty metre high Phase 8 telecommunications pole (with six antennas), two equipment cabinets and associated ancillary infrastructure.

    Refused Outline 10 docs
  • 578-586 CHISWICK HIGH ROAD, CHISWICK, W4 5RP

    P/2022/3853 Submitted 1 Dec 2022 111m away

    Retrospective application the installation of ten air conditioning condenser units to the flat roof of the existing office and retail (Class E) building with additional paving slabs and associated pipework.

    Granted Full applications 10 docs

In Hounslow

  • P/2026/1189 Granted

    12 The Grove, Isleworth, TW7 4JZ

    Installation of one front boundary gate and new windows to allow the conversion of existing single family house to five self contained flats with associated refuse and cycle storage.

    17 Apr 2026 Full applications
  • P/2026/1937 Granted

    Flat Ground Floor, 102 New Heston Road, Hounslow, TW5 0LF

    Erection of a single storey detached outbuilding for use as a home office in the rear garden of the flat

    30 Jun 2026 Full applications
  • P/2026/1494 Granted

    2 Bath Road, Chiswick, London, W4 1LW

    Demolition of the single-storey rear extension, installation of temporary scaffolding to the façade of the building, installation of associated plant equipment, an external condenser unit and acoustic shelter. Internal layout alterations and installation of secondary glazing, external alterations including re-rendering to allow continued use under Class E (c) and (g)(i)

    6 May 2026 Full applications
  • P/2026/1936 Refused

    Flat First Floor, 102 New Heston Road, Hounslow, TW5 0LF

    Erection of a rear roof and outrigger extension with two front rooflights to the flat

    30 Jun 2026 Full applications
  • P/2026/0592 Granted

    87 Cranleigh Road, Feltham, TW13 4QA

    Erection of a two storey residential house with associated landscaping, private amenity space, cycle and refuse storage.

    19 Feb 2026 Full applications