Planning application
9 Roebuck Close Horsham West Sussex RH13 5UL
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replacement windows and door.
As published by the council, reference DC/26/0265
Application record
- Reference
- DC/26/0265
- Type
- Full Application
- Status
- Decided
- Decision
- Application Permitted
- Received
- 16 Feb 2026
- Validated
- 16 Feb 2026
- Decided
- 13 Apr 2026
- Ward
- Roffey South
- Parish
- North Horsham PC
- Decision by
- Delegated Decision
- Postcode
- RH13 5UL
Timeline
Dates from the published record
-
16 Feb 2026
Received by Horsham
-
13 Apr 2026
Decision issued: Application Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
123 applications on PlanIndex · across 54 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
42 Roebuck Close Horsham West Sussex RH13 5UN
98% historically approved · decision due ~14 Jul
Surgery x 1 Oak
Awaiting decision Trees 2 docs -
Land North of 20 To 42 Roebuck Close Horsham West Sussex
Surgery to 1 x Oak. Surgery to 1 x Holly
Granted Trees 7 docs -
-
Flats 18 - 24 South Holmes Road Horsham West Sussex RH13 6HR
Replacement of the existing windows and doors with uPVC. Replacement of front entrance doors with GRP composite.
Granted Full applications Windows or glazing 15 docs -
Flats 42 - 48 South Holmes Road Horsham West Sussex RH13 6HR
Replacement of the existing windows and doors with uPVC. Replacement of front entrance doors with GRP composite.
Granted Full applications Windows or glazing 15 docs
Other full applications applications
In Horsham
-
DC/26/1044 Granted
Bentons Barn Bentons Lane Dial Post Horsham West Sussex RH13 8NP
Demolition of dwellinghouse and the erection of replacement dwelling.
-
DC/26/0953 Granted
119 High Street Steyning West Sussex BN44 3RE
Change of Use from a bakery, shop and residential flat to 4 no. residential units (3 x 2-bed flats and 1 x 2-bed maisonette) with associated alterations, including a hip to gable roof extension and addition of dormer windows.
-
DC/26/1321 Awaiting decision
Colgate Memorial Hall Forest Road Colgate West Sussex RH13 6HS
Installation of children's play equipment positioned in the location of pre-existing play equipment.
-
DC/26/1312 Awaiting decision
35 Churchill Avenue Horsham West Sussex RH12 2JP
Subdividing of existing plot and creation of a two storey, three bedroom dwelling. Demolition of garage and creation of vehicle access.
-
DC/26/1301 Awaiting decision
16 Jengers Mead Billingshurst West Sussex RH14 9PB
Reconfiguration of the existing ground floor retail unit and erection of an additional storey to provide 5 additional self-contained residential dwellings (Class C3), resulting in a total of 6 residential dwellings, with associated alterations to fenestration and rear access.