Planning application
19-22 CHIPPENDALE WAYE UXBRIDGE MIDDX
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of condition 2 (approved plans) for planning consent reference 67544/APP/2019/1978 dated 11-06-19 for the Erection of a block of 12 No. flats comprising of 7x1 bed, 4x2 bed and 1x3 bed apartments with associated parking, landscaping, access and amenity. The proposed changes are as follows: 1) Flat 1 extended to the rear to provide M4(3) requirement. 2) Flat 5 extended to the rear as per Flat 1 to simplify construction. 3) Lift/Stair core mirrored internally. 4) Rear elevation behind lift core goes up to main roof to simplify construction. 5) Balcony support posts added to simplify construction. 6) Roof over Flat 12 balcony removed to simplify construction
As published by the council, reference 67544/APP/2020/3709
Application record
- Reference
- 67544/APP/2020/3709
- Type
- Full
- Status
- Approval
- Decision
- Granted As published: Permitted
- Received
- 12 Nov 2020
- Validated
- 23 Nov 2020
- Decided
- 11 Mar 2021
- Ward
- UXBRIDGE NORTH
Timeline
Dates from the published record
-
12 Nov 2020
Received by Hillingdon
-
23 Nov 2020
Validated
Checked as complete and ready for consideration.
-
11 Mar 2021
Decision issued: Permitted
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hillingdon granted permission on 11 March 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Hillingdon
-
80195/APP/2026/1856 Withdrawn
HAYES PARK COTTAGE HAYES END DRIVE HAYES UB4 8EH
Change of use from Use Class E (Commercial, Business and Service) to Use Class C3 (Dwellinghouses) with associated cycle and refuse storage, and parking (Application under Class MA, Part 3 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended)).
-
80054/APP/2026/1884 Granted
BATFORD PLAYSPACE VARCOE GARDENS HAYES UB3 2FF
Details pursuant to the discharge of Conditions 6 (Biodiversity Gain Plan), 7 (method statement) and 8 (details of surface water management) of planning permission ref. 80054/APP/2026/1117, dated 09-07-26 (Remodelling of park space including soft landscaping, hard surfacing, a fenced play area and other associated works.)
-
79730/APP/2026/1240 Granted
71 CHESTER ROAD NORTHWOOD HA6 1BG
Erection of a single storey rear/side wraparound extension and first floor rear extension.
-
64733/APP/2026/1686 Granted
UNIT 1A COWLEY RETAIL PARK HIGH ROAD COWLEY UB8 2TE
Details pursuant to the discharge of Conditions 4 (cycle parking) and 5 (Travel Plan) of planning permission ref. 64733/APP/2025/2786, dated 20-05-2026 (Installation of mezzanine floor for use as Use Class E (Commercial, Business and Service))
-
16568/APP/2026/703 Granted
HOLLAND AND HOLLAND SHOOTING SCHOOL & ASHBY FARM DUCKS HILL ROAD NORTHWOOD HA6 1ST
Demolition of existing site buildings (excluding the retained central timber-framed barn), removal of existing hardstanding including the menage, change of use of part of the land to a workshop use (Use Class E(g)(iii)), and redevelopment of previously developed land to provide a workshop building with associated parking, hard and soft landscaping, formation of a pond, regrading of land levels, improvements to the existing access, sustainable drainage measures, and on-site biodiversity net gain enhancements.