Proposal
Non-material amendment (s96a) to planning consent ref 532/APP/2020/3198 for the construction of a new research building and an infill building which includes the partial redevelopment of an existing building for research purposes together with associated substation, two bin stores, car parking, access and landscaping. The following amendments are proposed . Roof lights omitted. . Alterations to windows and doors. . High level mesh screen omitted. . Curtain Wall to north facade reduced in size (Microscope Lab). . Louvres added (Microscope Lab). . Skylights added to Boardroom. . Green Screen omitted to East Elevation and added to South Elevation. . Canopy reduced in size and freestanding. . Retaining wall added to workshop building. . Retaining Wall removed.
As published by the council, reference 532/APP/2021/1995
Application record
- Reference
- 532/APP/2021/1995
- Type
- Full
- Status
- Approval
- Decision
- Granted As published: Permitted
- Received
- 17 May 2021
- Validated
- 18 May 2021
- Decided
- 21 Jun 2021
- Ward
- BRUNEL
Site history
Applications at this address on the Hillingdon register
This site has had 3 applications since 2021: 2 approved, 0 refused.
-
532/APP/2026/562 Awaiting decision
BRUNEL UNIVERSITY KINGSTON LANE HILLINGDON
Variation of Condition 9 (Reinstatement Plan) and extension to the operation period of the temporary gym facility secured by planning consent reference 532/APP/2020/1978 dated 23-04-2021 (Upgrade of existing sports pitch to provide World Rugby Compliant 3G Artificial Grass Pitch with associated perimeter fencing and technical dugout recessed areas, erection of temporary gym facility, and associated works) The application seeks to amend the reinstatement plan condition to a compliance condition and extend the operational period for the temporary gym facility for a further 10 years.
-
532/APP/2021/1992 Granted
BRUNEL UNIVERSITY KINGSTON LANE HILLINGDON
Details pursuant to Condition 6 (Flooding), Condition 7 (Tree Protection), Condition 8 (Landscaping), Condition 11 (Materials), Condition 12 (Living Walls), Condition 14 (Air Quality), Condition 15 (NRMM), Condition 16 (Low Emissions Strategy), Condition 17 (Construction Management Plan), Condition 18 (Crane Operation Plan), Condition 20 (Bird Hazard Plan), Condition 21 (Fire Safety Strategy), Condition 22 (Waste Management Strategy) and Condition 23 (Circular Economy) of planning consent ref 532/APP/2020/3198: Construction of a new research building and an infill building which includes the partial redevelopment of an existing building for research purposes together with associated substation, two bin stores, car parking, access and landscaping
Timeline
Dates from the published record
-
17 May 2021
Received by Hillingdon
-
18 May 2021
Validated
Checked as complete and ready for consideration.
-
21 Jun 2021
Decision issued: Permitted
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hillingdon granted permission on 21 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Hillingdon
-
80054/APP/2026/1884 Granted
BATFORD PLAYSPACE VARCOE GARDENS HAYES UB3 2FF
Details pursuant to the discharge of Conditions 6 (Biodiversity Gain Plan), 7 (method statement) and 8 (details of surface water management) of planning permission ref. 80054/APP/2026/1117, dated 09-07-26 (Remodelling of park space including soft landscaping, hard surfacing, a fenced play area and other associated works.)
-
79730/APP/2026/1240 Granted
71 CHESTER ROAD NORTHWOOD HA6 1BG
Erection of a single storey rear/side wraparound extension and first floor rear extension.
-
64733/APP/2026/1686 Granted
UNIT 1A COWLEY RETAIL PARK HIGH ROAD COWLEY UB8 2TE
Details pursuant to the discharge of Conditions 4 (cycle parking) and 5 (Travel Plan) of planning permission ref. 64733/APP/2025/2786, dated 20-05-2026 (Installation of mezzanine floor for use as Use Class E (Commercial, Business and Service))
-
16568/APP/2026/703 Granted
HOLLAND AND HOLLAND SHOOTING SCHOOL & ASHBY FARM DUCKS HILL ROAD NORTHWOOD HA6 1ST
Demolition of existing site buildings (excluding the retained central timber-framed barn), removal of existing hardstanding including the menage, change of use of part of the land to a workshop use (Use Class E(g)(iii)), and redevelopment of previously developed land to provide a workshop building with associated parking, hard and soft landscaping, formation of a pond, regrading of land levels, improvements to the existing access, sustainable drainage measures, and on-site biodiversity net gain enhancements.
-
77124/APP/2026/1792 Granted
14 BURTON ROAD UXBRIDGE UB10 0YE
Conversion of roof space to habitable use, incorporating 4 conservation rooflights (2 to the front and 2 to the rear roof slopes).