CHAILEY INDUSTRIAL ESTATE PUMP LANE HAYES UB3 3ND

Granted Hillingdon 2102/APP/2021/2604 Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details pursuant to the partial discharge of Condition 16 (Part iii only - Contamination) and Condition 17 (Imported Soil) for Phase 1 (as shown on the submitted Target Competition Phasing Plan) only of planning application reference 2102/APP/2018/4231 (Redevelopment of the site to provide three buildings ranging from 2 to 10 storeys in height delivering 331 residential units and 710 sq.m of ground floor commercial floorspace (Use Classes A1, A2, A3, B1, D1 or D2), including the provision of private and communal amenity areas, child play space, car parking, secure cycle parking, refuse storage areas and other associated development).

As published by the council, reference 2102/APP/2021/2604

Application record

Reference
2102/APP/2021/2604
Type
Full
Status
Approval
Decision
Permitted
Received
30 Jun 2021
Validated
30 Jun 2021
Decided
24 Aug 2021
Ward
TOWNFIELD
Postcode
UB3 3ND

Timeline

Dates from the published record

  1. 30 Jun 2021

    Received by Hillingdon

  2. 24 Aug 2021

    Decision issued: Permitted

  3. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hillingdon granted permission on 24 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • TELECOMMUNICATIONS SITE PUMP LANE HAYES UB3 3NF

    77911/APP/2023/708 Submitted 9 Mar 2023 143m away

    Proposed installation of a 15.0m high Phase 8 Monopole, 2 no. equipment cabinets, associated meter cabinet and ancillary development thereto (Application under Class A, Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for determination as to whether prior approval is required for siting and appearance).

    Granted Full applications 14 docs
  • TELECOMS PUMP LANE HAYES UB3 3NF

    77903/APP/2023/661 Submitted 6 Mar 2023 143m away

    Installation of 15m high streamline street works monopole, c/w 6no. antenna and 3no. ground based equipment cabinets and ancillary development thereto. (Application under Class A, Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) for determination as to whether prior approval is required for siting and appearance)

    Granted Full applications 3 docs
  • UNIT 1B, HALLS BUSINESS CENTRE PUMP LANE HAYES UB3 3NB

    73001/APP/2017/2382 Submitted 30 Jun 2017 189m away

    Change of use from industrial use (Use Class B2) to MOT and car repair Workshop (Sui Generis)

    Granted Full applications 9 docs
  • PASADENA CENTRE PASADENA CLOSE HAYES UB3 3NQ

    65646/APP/2022/3483 Submitted 15 Nov 2022 223m away

    Installation of solar PV panels to warehouse roof, the erection of a perimeter fence and the reinstatement of 10 no. dock leveller loading bays.

    Granted Full applications 27 docs
    Small domestic
  • Unit 4, Silverdale Industrial Estate Silverdale Road Hayes UB3 3BL

    244495CONS Submitted 22 Nov 2024 350m away

    Demolition of the existing building and structures on site, and all other associated site clearance works. Construction of a data centre building (Class B8) with plant at roof level with an emergency generator (1no.) and associated flue (provided within an external compound adjoining the data centre building), sprinkler tank and pumphouse, security guard house, and provision of one kiosk substation and MV Building. The development also comprises the construction of a new access and internal road and circulation areas, footpaths, provision of car and bicycle parking, hard and soft landscaping and other associated works and ancillary site infrastructure. (Out of Borough)

    Granted Outline Demolition 2 docs
  • SILVERDALE INDUSTRIAL ESTATE SILVERDALE ROAD HAYES UB3 3BL

    71374/APP/2026/424 Submitted 18 Feb 2026 350m away

    86% historically approved · decision due ~15 Apr

    Temporary planning permission for the erection of two single storey buildings for industrial use and associated works.

    Decided
    Small domestic

In Hillingdon

  • 14 LADYGATE LANE RUISLIP HA4 7QU

    Erection of single storey side and rear wraparound extension, a front porch, amendments to fenestration and roof lights to the front, side and rear sloped roof, following the removal of the rear chimney and garden shed. (Description Amended)

    24 Jun 2026 Full applications
  • 21 NORTH AVENUE HAYES UB3 2JE

    Erection of part single storey, part double storey rear extension

    13 Jul 2026 Full applications
  • 32 MANOR ROAD HAYES UB3 2DG

    Erection of a first-floor rear extension.

    1 Jun 2026 Full applications
  • 50 MINET DRIVE HAYES UB3 3JW

    Erection of a part single storey, part two storey extension to the rear

    1 Jul 2026 Full applications
  • 6 SQUIRRELS TRADING ESTATE VIVEASH CLOSE HAYES UB3 4RZ

    Change of use from Class B8 to Class E retail

    8 Jul 2026 Full applications