Planning application
82 BRIDLE ROAD EASTCOTE
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part two storey, part single storey side extension, part two storey, part single storey rear extension, conversion of roof space to habitable use to include side dormer, insertion of rooflights, patio to rear, external alterations including fenestration changes and works to front driveway to amend the ground level and erection of a front extension with covered porch
As published by the council, reference 19714/APP/2022/3636
Application record
- Reference
- 19714/APP/2022/3636
- Type
- Full
- Status
- Approval
- Decision
- Granted As published: Permitted
- Received
- 30 Nov 2022
- Validated
- 30 Nov 2022
- Decided
- 14 Feb 2023
- Ward
- EASTCOTE 2022
Site history
Applications at this address on the Hillingdon register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
19714/APP/2021/2445 Granted
82 BRIDLE ROAD EASTCOTE
Part two storey, part single storey side extension, part two storey, part single storey rear extension, conversion of roof space to habitable use to include side dormer, insertion of rooflights, patio to rear, and external alterations including fenestration changes and works to front driveway to amend the ground level
Timeline
Dates from the published record
-
30 Nov 2022
Received by Hillingdon
-
14 Feb 2023
Decision issued: Permitted
-
16 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hillingdon granted permission on 14 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Hillingdon
-
80195/APP/2026/1856 Withdrawn
HAYES PARK COTTAGE HAYES END DRIVE HAYES UB4 8EH
Change of use from Use Class E (Commercial, Business and Service) to Use Class C3 (Dwellinghouses) with associated cycle and refuse storage, and parking (Application under Class MA, Part 3 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended)).
-
80054/APP/2026/1884 Granted
BATFORD PLAYSPACE VARCOE GARDENS HAYES UB3 2FF
Details pursuant to the discharge of Conditions 6 (Biodiversity Gain Plan), 7 (method statement) and 8 (details of surface water management) of planning permission ref. 80054/APP/2026/1117, dated 09-07-26 (Remodelling of park space including soft landscaping, hard surfacing, a fenced play area and other associated works.)
-
79730/APP/2026/1240 Granted
71 CHESTER ROAD NORTHWOOD HA6 1BG
Erection of a single storey rear/side wraparound extension and first floor rear extension.
-
64733/APP/2026/1686 Granted
UNIT 1A COWLEY RETAIL PARK HIGH ROAD COWLEY UB8 2TE
Details pursuant to the discharge of Conditions 4 (cycle parking) and 5 (Travel Plan) of planning permission ref. 64733/APP/2025/2786, dated 20-05-2026 (Installation of mezzanine floor for use as Use Class E (Commercial, Business and Service))
-
16568/APP/2026/703 Granted
HOLLAND AND HOLLAND SHOOTING SCHOOL & ASHBY FARM DUCKS HILL ROAD NORTHWOOD HA6 1ST
Demolition of existing site buildings (excluding the retained central timber-framed barn), removal of existing hardstanding including the menage, change of use of part of the land to a workshop use (Use Class E(g)(iii)), and redevelopment of previously developed land to provide a workshop building with associated parking, hard and soft landscaping, formation of a pond, regrading of land levels, improvements to the existing access, sustainable drainage measures, and on-site biodiversity net gain enhancements.