Skip to content
PlanIndex Get alerts
Menu

Planning application

SSE Fasnakyle Power Station Fasnakyle Cannich

Granted Highland 26/02086/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations (replacement doors) & installation of CCTV equipment

As published by the council, reference 26/02086/LBC

Application record

Reference
26/02086/LBC
Type
Listed Building Consent
Status
Decided
Decision
Granted As published: Listed Building Consent
Received
16 May 2026
Validated
12 Jun 2026
Decided
20 Jul 2026
Ward
Aird And Loch Ness
Parish
Strathglass Community Council
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 16 May 2026

    Received by Highland

  2. 12 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2026

    Decision issued: Listed Building Consent

  4. 27 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Highland granted permission on 20 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • SSE Fasnakyle Switching Station Cannich

    26/01217/SCRE Submitted 17 Mar 2026 350 yards away

    Fasnakyle to Bingally 132kV overhead line connection

    Decided Outline 6 docs
  • SSE Fasnakyle Switching Station Cannich

    26/04120/PAN Submitted 18 Sep 2026 350 yards away

    97% historically approved · decision due ~13 Nov

    Fasnakyle to Bingally 132kV connection - Construction and operation of a new section of OHL between the existing Tower 201 and the proposed new Tower 200R, within the proposed new CSE compound. Removal of approximately 440m of OHL at the Beauly-Denny tie in between Tower 201 and Tower 64. Upgrades to the existing access track, the use of temporary working areas around the proposed Cable Sealing End compound and the towers, and the establishment of a temporary construction compound.

    Awaiting decision 2 docs

In Highland

  • 26/02574/LBC Granted

    Arisaig Church Arisaig PH39 4NJ

    Internal alterations to building

    Received 16 Jun, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/01092/LBC Granted

    Well Pharmacy 23 - 25 High Street Tain IV19 1AE

    Painting of 4no. windows and door (retrospective)

    Received 13 Mar, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/02074/LBC Granted

    Land 100M SW Of North Lodge Clashmore

    Combination of 2no cottages, reinstatement of some original traditional detailing

    Received 15 May, published by the council 27 Jul 2026 Heritage and listed buildings
  • 26/04091/LBC Awaiting decision

    Dunnichen Strathpeffer IV14 9DX

    Removal of partition sepearating two units

    Received 18 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • 26/04049/LBC Awaiting decision

    Dundonnell House Dundonnell Garve IV23 2QW

    Internal and External Alterations to House Including to Window Openings, Removal of Lobby to Rear and Installation of Mono Pich Roof and Replacement of Conservatory Extension to Rear with Pitched Roof Extension

    Received 16 Sep, published by the council 5 Oct 2026 Heritage and listed buildings