Land 1500M SE Of Borlum House Reay

Granted Highland 25/03631/S37 Section 37

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New 33kV EHV overhead line spur comprising a single span of 22 metre length supported by wooden poles of 10 metre height between NGR NC97596268 and NC97616270 located within the planning authority area of Highland Council by Limekiln Substation (Limekiln Wind Farm), Reay, Thurso, Caithness

As published by the council, reference 25/03631/S37

Application record

Reference
25/03631/S37
Type
Section 37
Status
Decided
Decision
S37 Raise No Objection
Received
24 Sep 2025
Validated
24 Sep 2025
Decided
21 Oct 2025
Ward
Thurso And North West Caithness
Parish
Caithness West Community Council
Decision by
Delegated Decision

Site history

Applications at this address on the Highland register

This site has had 3 applications since 2025: 2 approved, 0 refused.

  • 25/03634/S37 Withdrawn

    Land 1500M SE Of Borlum House Reay

    Erect new 33kV EHV overhead line spur comprising a single span of 22 metre length supported by wooden poles of 10 metre height between NGR NC97596268 and NC97616270 located within the planning authority area of Highland Council by Limekiln Substation (Limekiln Wind Farm), Reay, Thurso, Caithness

    Decided 2 Oct 2025
  • 25/02861/S36 Granted

    Land 1500M SE Of Borlum House Reay

    Limekiln Battery Energy Storage System (BESS) - Construction and operation of a proposed Battery Energy Storage System (BESS) (over 50 MW) and an extension to the existing Limekiln Wind Farm Substation, associated infrastructure, access and ancillary works. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00006154

    Decided 16 Mar 2026

Timeline

Dates from the published record

  1. 24 Sep 2025

    Received by Highland

  2. 21 Oct 2025

    Decision issued: S37 Raise No Objection

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Highland granted permission on 21 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Highland's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • Land 1500M SE Of Borlum House Reay

    25/03634/S37 Submitted 24 Sep 2025 80m away

    Erect new 33kV EHV overhead line spur comprising a single span of 22 metre length supported by wooden poles of 10 metre height between NGR NC97596268 and NC97616270 located within the planning authority area of Highland Council by Limekiln Substation (Limekiln Wind Farm), Reay, Thurso, Caithness

    Withdrawn 7 docs