Skip to content
PlanIndex Get alerts
Menu

Planning application

61 , Old Road , Whaley Bridge , Derbyshire , SK23 7LA

Granted High Peak HPK/2021/0150 Listed Building Consent - Alteration

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Listed Building Consent to remove the existing internal concrete steps and replace with timber, replace the existing lounge floor structure, replace the existing utility floor structure, internal alterations and new lower ground window.

As published by the council, reference HPK/2021/0150

Application record

Reference
HPK/2021/0150
Type
Listed Building Consent - Alteration
Status
Granted As published: LB-APP
Decision
Granted As published: Permitted
Received
18 Mar 2021
Validated
30 Mar 2021
Decided
30 Jun 2021
Postcode
SK23 7LA

Site history

Applications at this address on the High Peak register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • HPK/2021/0149 Granted

    61 , Old Road , Whaley Bridge , Derbyshire , SK23 7LA

    Removal of the existing internal concrete steps and replace with timber, replace the existing lounge floor structure, replace the existing utility floor structure, internal alterations and new lower ground window.

    Decided 30 Jun 2021 Householder

Timeline

Dates from the published record

  1. 18 Mar 2021

    Received by High Peak

  2. 30 Mar 2021

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jun 2021

    Decision issued: Permitted

  4. 9 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

High Peak granted permission on 30 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In High Peak

  • HPK/2026/0395 Withdrawn

    Glossop Railway Station , Norfolk Street , Glossop , Derbyshire , SK13 8BS

    Listed Building Consent for the instillation of Passenger Information Display (“PID”) board and wayfinding signage

    Received 6 Oct, published by the council 12 Oct 2026 Heritage and listed buildings
  • DOC/2026/0061 Granted

    1-6 , ST JAMES SQUARE , NEW MILLS , DERBYSHIRE , SK22 4BB

    Listed Building Consent for a like for like replacement of existing windows to the primary facade of Inghams Almshouses, no. 1 - 6 St James Square

    Received 19 Aug, published by the council 8 Aug 2026 Heritage and listed buildings
  • HPK/2026/0384 Withdrawn

    7 , Pyegrove , Glossop , Derbyshire , SK13 8RA

    Listed Building Consent for the installation of an EV charger on the front right porch area of the building.

    Received 30 Sep, published by the council 5 Oct 2026 Heritage and listed buildings
  • HPK/2026/0262 Granted

    Canal House , Buxworth , Derbyshire , SK23 7NF

    Listed Building Consent for Installation of 3 air source heat pumps and raising height of river boundary wall

    Received 29 Jun, published by the council 22 Jul 2026 Heritage and listed buildings
  • HPK/2026/0286 Granted

    17 , Broad Walk , Buxton , Derbyshire , SK17 6JR

    Listed building consent for 1.) Re-tile the rear paved garden adding a improved drainage to the existing drainage system on the back 2.) Remove the ramp and partial tarred covering outside the entrance to the flat and replace with a tiled path and gravel to recreate the original lawn. Note: This also entails the removal of existing cables hanging from the building and repainting of the front door in a heritage colour.

    Received 20 Jul, published by the council 23 Jul 2026 Heritage and listed buildings