Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 12 Hamilton Business Park Stirling Way Borehamwood Hertfordshire WD6 2FR

Granted Hertsmere 24/1166/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of the side-rear extension for equipment storage and removal of the extraction flu. (Part retrospective)

As published by the council, reference 24/1166/FUL

Application record

Reference
24/1166/FUL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Grant Permission
Received
12 Sep 2024
Validated
20 Sep 2024
Decided
29 Nov 2024
Ward
Borehamwood Hillside
Parish
Elstree & Borehamwood Town Council
Decision by
Delegated Decision
Postcode
WD6 2FR

Site history

Applications at this address on the Hertsmere register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 26/1131/FUL Awaiting decision

    Unit 12 Hamilton Business Park Stirling Way Borehamwood Hertfordshire WD6 2FR

    Part first part second floor extension with associated roof alterations.

    Submitted 10 Aug 2026 Full applications

Timeline

Dates from the published record

  1. 12 Sep 2024

    Received by Hertsmere

  2. 20 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Nov 2024

    Decision issued: Grant Permission

  4. 9 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

GRArchitecture Ltd Agent

23 applications on PlanIndex · across 14 councils · 78% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

  • Decision notice Decision · 02 Dec 2024
  • Delegated report Delegated Report · 02 Dec 2024
  • Proposed elevations Drawing/Plans · 18 Nov 2024
  • Proposed ground floor plan Drawing/Plans · 18 Nov 2024
  • Highways response Consultee replies · 17 Oct 2024
  • Consultee comment submitted online Consultee Comment · 03 Oct 2024
  • Applicationform Application Form · 20 Sep 2024
  • Cil form CIL · 20 Sep 2024
  • Design and access statement Supporting Documents · 20 Sep 2024
  • Existing ground floor plan Drawing/Plans · 20 Sep 2024
  • Existing first floor plan Drawing/Plans · 20 Sep 2024
  • Existing second floor plan Drawing/Plans · 20 Sep 2024
  • Existing roof plan Drawing/Plans · 20 Sep 2024
  • Existing front and rear elevations Drawing/Plans · 20 Sep 2024
  • Existing side elevations Drawing/Plans · 20 Sep 2024
  • Existing section a-a Drawing/Plans · 20 Sep 2024
  • Proposed first floor plan Drawing/Plans · 20 Sep 2024
  • Proposed second floor plan Drawing/Plans · 20 Sep 2024
  • Proposed roof plan Drawing/Plans · 20 Sep 2024
  • Proposed front and rear elevations Drawing/Plans · 20 Sep 2024
  • Proposed section a-a Drawing/Plans · 20 Sep 2024
  • Site location plan Drawing/Plans · 20 Sep 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hertsmere granted permission on 29 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Hertsmere

  • 26/1045/FUL Decided

    The Borehamwood Elstree Childrens Centre Shakespeare Drive Borehamwood Hertfordshire WD6 2FD

    Erection of 2x banners.

    Received 27 Jul, published by the council 28 Aug 2026 Full applications
  • 26/1504/FUL Awaiting decision

    100 London Road Shenley Radlett Hertfordshire WD7 9DX

    Single-storey front extension.

    Received 19 Oct, published by the council 21 Oct 2026 Full applications
  • 26/1033/FUL Granted

    4 Farrington Avenue Bushey Hertfordshire WD23 3DG

    Retention of existing single storey outbuilding for continued charitable initiatives associated with the Red Trust, Bushey (Retrospective).

    Received 23 Jul, published by the council 8 Aug 2026 Full applications
  • 26/1503/FUL Awaiting decision

    138 Darkes Lane Potters Bar Hertfordshire EN6 1AF

    Single storey rear extension, alterations to the shopfront, relocation of the external rear steel staircase and installation of a commercial kitchen extraction and filtration system.

    Received 19 Oct, published by the council 23 Oct 2026 Full applications
  • 26/1497/FUL Awaiting decision

    46 London Road Shenley Radlett Hertfordshire WD7 9DY

    Demolition of existing garage and subdivision to facilitate construction of two storey detached dwelling, front boundary works to include re-positioning of crossover / dropped kerb and vehicular hardstanding with associated hard and soft landscaping, bin and bicycle storage.

    Received 16 Oct, published by the council 22 Oct 2026 Full applications