Planning application
29 Southgate Road Potters Bar Hertfordshire EN6 5EA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use from class C3 to Class sui generis seven (7) bedroom HMO use facilitated by minor internal alterations.
As published by the council, reference 24/0828/FUL
Application record
- Reference
- 24/0828/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Grant Permission
- Received
- 24 Jun 2024
- Validated
- 24 Jun 2024
- Decided
- 29 Aug 2024
- Ward
- Potters Bar Oakmere
- Parish
- No Parish
- Decision by
- Delegated Decision
- Postcode
- EN6 5EA
Timeline
Dates from the published record
-
24 Jun 2024
Received by Hertsmere
-
29 Aug 2024
Decision issued: Grant Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
262 applications on PlanIndex · across 22 councils · 64% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
33 Southgate Road Potters Bar Hertfordshire EN6 5EA
Single storey rear side extension, conversion of garage to habitable room and internal alterations to ground floor flat.
Granted Full applications Extension 10 docsSmall domestic -
31 Whaley Road Potters Bar Hertfordshire EN6 2RA
84% historically approved · decision due ~30 Jul
2no. single storey rear extensions. Depth: 6m, Height: 3m, Eaves: 3m.
Decided Extension 7 docsSmall domestic -
31 Whaley Road Potters Bar Hertfordshire EN6 2RA
84% historically approved · decision due ~30 Jul
Single storey rear extensions Depth: 6.00m, Height: 3.00m, Eaves: 3.00m.
Decided Extension 6 docsSmall domestic -
31 Whaley Road Potters Bar Hertfordshire EN6 2RA
84% historically approved · decision due ~10 Sep
2x single storey rear extensions. Depth: 5.00m, Height: 3.00m, Eaves: 3.00m.
Decided Extension 6 docsSmall domestic -
31 Whaley Road Potters Bar Hertfordshire EN6 2RA
84% historically approved · decision due ~10 Sep
2x single storey rear extensions. Depth: 5.95m, Height: 3.00m, Eaves: 3.00m.
Decided Extension 7 docsSmall domestic -
31 Whaley Road Potters Bar Hertfordshire EN6 2RA
84% historically approved · decision due ~22 Oct
Construction of 2x single storey rear extensions Depth: 5.00m, Height: 3.00m, Eaves: 3.00m.
Awaiting decision ExtensionSmall domestic
Other full applications applications
In Hertsmere
-
26/0455/FUL Granted
34 - 36 Northfield Road Borehamwood Hertfordshire
Construction of part single, part two storey side and rear extension to both properties, and alterations to fenestration.
-
26/0166/FUL Granted
Meadow Park Broughinge Road Borehamwood Hertfordshire
Re-modelling of Brook Road Car Park, construction of a cafe with public toilets, addition of a tree lined pedestrian access creating a new entrance to the park, and installation of external lighting and additional CCTV.
-
25/1463/FUL Granted
Land To The South East Of Electricity Station Hilfield Lane Aldenham Hertfordshire
Construction of a new permanent access road and bellmouth onto Hilfield Lane; two bunds utilising excavated material from construction; and associated drainage, together with a landscaping scheme, and a biodiversity net gain (BNG) strategy (revised plans received relate to amended red edge / site access / internal access changes / and associated landscape changes).
-
26/1211/FUL Awaiting decision
49 London Road Shenley Radlett Hertfordshire WD7 9BN
Demolition of existing modern extension comprising the conservatory, kitchen and utility room.
-
26/1206/FUL Awaiting decision
22 Watford Road Radlett Hertfordshire WD7 8LE
Demolition of existing detached dwelling and redevelopment of the site to provide 5x self-contained residential apartments, with associated parking, access, landscaping, refuse and cycle storage.