Skip to content
PlanIndex Get alerts
Menu

Planning application

32 Shenley Hill Radlett Hertfordshire WD7 7BB

Granted Hertsmere 21/0181/FUL Full Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing house, construction of replacement detached 2 storey, 5 bed dwelling to include accommodation within the roof space and associated landscaping, parking and bin store.

As published by the council, reference 21/0181/FUL

Application record

Reference
21/0181/FUL
Type
Full Planning Permission
Status
Decided
Decision
Grant Permission
Received
27 Jan 2021
Validated
10 Feb 2021
Decided
28 May 2021
Ward
Aldenham East
Parish
Aldenham Parish
Decision by
Delegated Decision
Postcode
WD7 7BB

Timeline

Dates from the published record

  1. 27 Jan 2021

    Received by Hertsmere

  2. 10 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 28 May 2021

    Decision issued: Grant Permission

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 36 Shenley Hill Radlett Hertfordshire WD7 7BD

    24/1356/HSE Submitted 21 Oct 2024 53m away

    Installation of 2x air source heat pumps and 4x air-conditioning units. (Retrospective application)

    Granted Householder 8 docs
    Domestic
  • 29 Shenley Hill Radlett Hertfordshire WD7 7AU

    23/0121/HSE Submitted 24 Jan 2023 56m away

    Alteration of flat roof above rear extension to create accessible flat roof with perimeter metal balustrade and conversion of window to doorway.

    Refused Householder Extension Windows or glazing 28 docs
    Domestic
  • 4 The Sycamores Radlett Hertfordshire WD7 7LJ

    23/0222/TPO Submitted 8 Feb 2023 95m away

    T4 HOLLY. Reduce to a final height of 5m andspread 3.5m. As per annotated photograph.

    Granted Trees 5 docs
  • 13 Williams Way Radlett Hertfordshire WD7 7EZ

    24/1318/HSE Submitted 14 Oct 2024 141m away

    Construction of single storey front extension to fill in existing car port and to include infill porch.

    Granted Householder Extension 10 docs
    Small domestic
  • 54 Shenley Hill Radlett Hertfordshire WD7 7BD

    24/1165/HSE Submitted 12 Sep 2024 141m away

    Conversion of loft to habitable room with hip to gable roof alterations, increase in ridge height and rear dormers. First floor rear infill extension.

    Granted Householder Extension Loft or dormer +1 20 docs
    Domestic
  • 1 The Avenue Radlett WD7 7DG

    DOC/12/2660 Submitted 21 Dec 2012 144m away

    Application for approval of details reserved by condition(s) 2 & 4 of planning permission reference TP/12/1084.

    Granted Conditions

In Hertsmere

  • 26/0455/FUL Granted

    34 - 36 Northfield Road Borehamwood Hertfordshire

    Construction of part single, part two storey side and rear extension to both properties, and alterations to fenestration.

    7 Apr 2026 Full applications
  • 26/0166/FUL Granted

    Meadow Park Broughinge Road Borehamwood Hertfordshire

    Re-modelling of Brook Road Car Park, construction of a cafe with public toilets, addition of a tree lined pedestrian access creating a new entrance to the park, and installation of external lighting and additional CCTV.

    10 Feb 2026 Full applications
  • 25/1463/FUL Granted

    Land To The South East Of Electricity Station Hilfield Lane Aldenham Hertfordshire

    Construction of a new permanent access road and bellmouth onto Hilfield Lane; two bunds utilising excavated material from construction; and associated drainage, together with a landscaping scheme, and a biodiversity net gain (BNG) strategy (revised plans received relate to amended red edge / site access / internal access changes / and associated landscape changes).

    8 Oct 2025 Full applications
  • 26/1211/FUL Awaiting decision

    49 London Road Shenley Radlett Hertfordshire WD7 9BN

    Demolition of existing modern extension comprising the conservatory, kitchen and utility room.

    21 Aug 2026 Full applications
  • 26/1206/FUL Awaiting decision

    22 Watford Road Radlett Hertfordshire WD7 8LE

    Demolition of existing detached dwelling and redevelopment of the site to provide 5x self-contained residential apartments, with associated parking, access, landscaping, refuse and cycle storage.

    20 Aug 2026 Full applications