Planning application
Land To The South Of Hereford
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New access road from A49 north of Grafton Villa extending across land south of Bullinghope and Green Crize, crossing Watery Lane and joiningthe B4399 at Gate House Road.
As published by the council, reference DCC022794/F
Application record
- Reference
- DCC022794/F
- Type
- Planning Permission
- Status
- Determination Made
- Decision
- Council Approved Application
- Received
- 4 Sep 2002
- Validated
- 4 Sep 2002
- Decided
- 21 Feb 2003
- Ward
- Z_Kingsthorne 1998-2003
- Parish
- Lower Bullingham
Timeline
Dates from the published record
-
4 Sep 2002
Received by Herefordshire, County of
-
21 Feb 2003
Decision issued: Council Approved Application
-
31 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Herefordshire, County of granted permission on 21 February 2003, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land at Lower Bullingham (The Southern Urban Expansion) Land to the north of the B4399 Lower Bullingham Hereford
92% historically approved · decision due ~25 Mar
A mixed use urban extension of land at Lower Bullingham (known as the 'Southern Urban Expansion' in the Local Plan) to provide up to 1300 dwellings (including specialist housing), B1, B2 and B8 employment uses, a Neighbourhood Community Hub (A1, A3 & A5), a new primary school, a Park and Choose, a country park, public open space, access, drainage and other associated works and demolition of existing industrial buildings. All matters are reserved for future consideration save for 'access'. Only the means of access into the site is sought as part of this outline application, not the internal site access arrangements (i.e. not formally form part of application)
Awaiting decision Outline Extension Demolition 225 docsMajor scheme -
Green Crize Cottage Green Crize Hereford Herefordshire HR2 8AA
Proposed extension and alterations.
Granted Householder Extension 10 docsDomestic
Other full applications
In Herefordshire, County of
-
P261291/F Granted
Weggs Pony Club, The Stables Kinnersley Hereford Herefordshire HR3 6NY
Replace a barn with a holiday let & sustainable sewage system.
-
P261484/F Granted
Land adjacent Homestead Farm Cothars Pitch Gorsley Herefordshire
Variation of condition 11 of planning permission 213307 (Proposed erection of storage and distribution building, construction of new vehicular access and associated works) - to allow a general B8 use forthree years.
-
P261778/F Granted
Instone Court Munderfield Bromyard Herefordshire HR7 4JS
Change of use of part of poultry unit into an under cover, secure dog walking enclosure, with associated parking
-
P261021/F Granted
Bircham Grange Clenchers Mill Lane Eastnor Ledbury Herefordshire HR8 1RW
Conversion of four existing bedrooms (Rooms 2, 3, 14 & 15) into two larger bedrooms. Construction of new single storey wing in northwest of site containing two new bedrooms (no overall increase in occupancy)together with pastry kitchen for residents use and covered outdoor seating area.
-
P260917/F Granted
Martha Trust House, Hampton Green Old Eign Hill Hereford Herefordshire HR1 1UB
Removal of existing defective glazed link. Erection of a replacement link structure with extension to include creation of a resident's garden room. Staff room extension and reorganisation of internal layout to improve functionality and resident enjoyment.