Planning application
Former St Bernards Day Centre Peel Way Harold Wood RM3 0PD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition 13 and 22 - P0254.23
As published by the council, reference Q0147.26
Application record
- Reference
- Q0147.26
- Type
- Conditions
- Status
- ALL DECISIONS ISSUED
- Decision
- Permitted
- Received
- 2 Jun 2026
- Validated
- 2 Jun 2026
- Decided
- 27 Jul 2026
- Postcode
- RM3 0PD
Site history
Applications at this address on the Havering register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
P0254.23 Granted
Former St Bernards Day Centre Peel Way Harold Wood RM3 0PD
3 storey building comprising 4 x 3-bed, 4 x 2-bed, and 1 x 1-bed self contained flats, with associated parking, cycle store, and landscaping, involving demolition of existing buildings.
Timeline
Dates from the published record
-
2 Jun 2026
Received by Havering
-
26 Jul 2026
Added to PlanIndex
-
27 Jul 2026
Decision issued: Permitted
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Havering granted permission on 27 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Former St Bernards Day Centre Peel Way Harold Wood London RM3 0PD
Discharge of Condition 12 & 20 of P0254.23
Granted Conditions 7 docs -
Former St Bernards Day Centre Peel Way Harold Wood RM3 0PD
3 storey building comprising 4 x 3-bed, 4 x 2-bed, and 1 x 1-bed self contained flats, with associated parking, cycle store, and landscaping, involving demolition of existing buildings.
Granted Full applications New dwelling Demolition 30 docs -
Former St Benards Centre Peel Way Harold Wood Romford RM3 0JD
Discharge of Condition 3 of P0254.23
Granted Conditions 5 docs -
Primula Court, Safflower Lane Romford RM3 0LQ
Certificate of Lawfulness for the replacement of external wall cladding and external decking materials to match the appearance of the existing.
Granted Outline 9 docs -
42 Gubbins Lane Romford RM3 0PU
Single storey rear extension with an overall depth of 4m, a maximum height of 3.2m, and an eaves height of 2.5m. (PRIOR APPROVAL)
Granted Outline Extension 6 docsSmall domestic -
33 Gubbins Lane Romford RM3 0QA
Use of property for supported living accommodation
Granted Full applications 7 docs
Other condition discharge and variation applications
In Havering
-
Q0089.26 Granted
9 Parkstone Avenue Hornchurch RM11 3LX
proposed demolition of the existing dwelling at 9 Parkstone Avenue and the erection of a new seven-bedroom dwelling with associated swimming pool complex. P0739.24 Conditions(s) 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20
-
Q0181.26 Granted
15 Balgores Lane Romford RM2 5JT
Ground floor rear extension, first floor front and rear extensions, new roof and front porch canopy P0391.26 Condition 3
-
Q0169.26 Granted
2 Putters Lane Upminster RM14 1FB
Discharge of Condition 5 of P0421.26
-
Q0150.26 Granted
6 Meadway Romford RM2 5NU
Discharge of Condition 5 of P0006.26
-
Q0159.26 Granted
Land at Barlow Way South 0 Fairview Industrial Estate Rainham London RM13 8UH
Details Pursuant to partial discharge of Conditions 14(Construction Methodology), 15(Dust Monitoring Scheme), 16(Wheel washing) of Planning Permission P1377.22, dated 10-04-26 for Demolition of all existing warehouse buildings/structures and erection of 3nos. new flexible industrial/logistics units falling within Use Classes E(g)(ii)/(iii), B2 and/or B8 and all associated infrastructure works, access arrangements, parking, and hard and soft landscaping.