Skip to content
PlanIndex Get alerts
Menu

Planning application

35 Homeway Romford RM3 0HD

Granted Havering P1149.25 Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey front extension including garage conversion to habitable space, and alterations to front steps to facilitate installation of scissor lift.

As published by the council, reference P1149.25

Application record

Reference
P1149.25
Type
Full
Status
Apprv with cons Conditions/Reasons
Decision
Granted subject to conditions
Received
2 Sep 2025
Validated
3 Oct 2025
Decided
28 Nov 2025
Ward
Harold Wood
Postcode
RM3 0HD

Timeline

Dates from the published record

  1. 2 Sep 2025

    Received by Havering

  2. 3 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Nov 2025

    Decision issued: Granted subject to conditions

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2 Homeway Romford RM3 0HD

    P1547.23 Submitted 16 Oct 2023 0m away

    Proposed outbuilding at rear of garden

    Granted Full applications 5 docs
  • 9 HOMEWAY ROMFORD RM3 0HD

    P0419.25 Submitted 26 Mar 2025 0m away

    Retrospective application for single storey side extension, single storey rear extension, relocation of main entrance to front with roof canopy and steps

    Granted Full applications Extension 6 docs
    Small domestic
  • 15 Homeway Romford RM3 0HD

    P1390.23 Submitted 11 Sep 2023 0m away

    Conversion of existing outbuilding/hobby room into habitable use ancillary to main dwelling

    Withdrawn Full applications 3 docs
    Small domestic
  • 6 Homeway Romford RM3 0HD

    P1389.23 Submitted 11 Sep 2023 0m away

    Erection of an outbuilding for temporary use for 24 months as a residential unit for occupants of the main house during construction works to main house (Updated)

    Granted Full applications 7 docs
  • 6 Homeway, Harold Wood Romford RM3 0HD

    P0008.25 Submitted 3 Jan 2025 0m away

    Erection of a 5-bed detached dwelling following demolition of existing bungalow

    Granted Full applications New dwelling Demolition 12 docs
    Domestic
  • 40 Homeway Romford RM3 0HD

    D0338.24 Submitted 21 Aug 2024 0m away

    Certificate of lawfulness for hip to gable loft Conversion with rear Dormer and 3x Front Skylights.

    Granted Outline Loft or dormer 8 docs

In Havering

  • P0738.26 Granted

    3 Marlborough Gardens Upminster RM14 1SF

    Single storey rear extension

    17 Jun 2026 Full applications
  • P0675.26 Granted

    182 Hainault Road Romford RM5 3AS

    Demolition of existing garage and construction of a single-storey side extension to form an additional bedroom for the existing HMO. Occupancy to increase from a maximum of five persons to a maximum of six persons.

    2 Jun 2026 Full applications
  • P0825.26 Granted

    377 Havering Road Romford RM1 4BW

    Single storey rear extension and access ramp

    7 Jul 2026 Full applications
  • P0804.26 Granted

    31 Wells Gardens Rainham RM13 7LU

    Removal of existing porch. Construction of a double storey Front Extension. Provision of one off - street car parking space to the front of application property.

    1 Jul 2026 Full applications
  • P0786.26 Granted

    50 Marlborough Road Romford RM7 8AJ

    Part double and part single storey rear extension and front porch

    25 Jun 2026 Full applications