Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Oak Street Romford RM7 7BS

Granted Havering P1008.24 Full

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hip to gable loft conversion with rear dormer and rooflights and porch ( Retrospective application ).

As published by the council, reference P1008.24

Application record

Reference
P1008.24
Type
Full
Status
Refuse Conditions/Reasons
Decision
Granted subject to conditions
Received
16 Jul 2024
Validated
5 Aug 2024
Decided
29 Nov 2024
Ward
Rush Grn & Crowlands
Postcode
RM7 7BS

Timeline

Dates from the published record

  1. 16 Jul 2024

    Received by Havering

  2. 5 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Nov 2024

    Decision issued: Granted subject to conditions

  4. 21 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Oak Street Romford RM7 7BS

    P0549.26 Submitted 5 May 2026 0m away

    Hip to gable loft conversion with rear dormer and roof lights to front (Retrospective)

    Granted Full applications Loft or dormer 8 docs
  • 1 Oak Street Romford RM7 7BS

    P1404.25 Submitted 28 Oct 2025 0m away

    Double Storey Side Extension - Incorporating Remedial Works to the completed 2nd Floor Loft Conversion

    Withdrawn Full applications Extension Loft or dormer 5 docs
  • 135 Mawney Road Romford RM7 7BH

    P1108.23 Submitted 13 Jul 2023 86m away

    Extend the current dropped kerb (width 2.27 metres which includes 0.6 metre ramp and depth of 3.56 metres).

    Granted Full applications 6 docs
  • 121 Mawney Road Romford RM7 7BH

    P0330.25 Submitted 12 Mar 2025 86m away

    Retrospective application to retain a two storey side and part two storey, part single storey rear extensions, loft conversion with roof alterations, front and rear dormers and proposed replacement of wooden fence with metal fence and installation of an extractor flue and canopy connection to the rear elevation for the proposed conversion of the ground floor to restaurant

    Granted Full applications Extension Loft or dormer +1 11 docs
    Small domestic
  • 121 & 123 Mawney Road Romford RM7 7BH

    P1366.23 Submitted 5 Sep 2023 86m away

    Hip to gable end conversion of lofts to habitable use including the installation of 4 x front and 2 x rear dormers.

    Granted Full applications Loft or dormer 7 docs
  • 123 Mawney Road Romford RM7 7BH

    P1464.25 Submitted 10 Nov 2025 86m away

    Retrospective application for siting an InPost Parcel Locker

    Granted Full applications 7 docs

In Havering

  • P0738.26 Granted

    3 Marlborough Gardens Upminster RM14 1SF

    Single storey rear extension

    17 Jun 2026 Full applications
  • P0675.26 Granted

    182 Hainault Road Romford RM5 3AS

    Demolition of existing garage and construction of a single-storey side extension to form an additional bedroom for the existing HMO. Occupancy to increase from a maximum of five persons to a maximum of six persons.

    2 Jun 2026 Full applications
  • P0825.26 Granted

    377 Havering Road Romford RM1 4BW

    Single storey rear extension and access ramp

    7 Jul 2026 Full applications
  • P0804.26 Granted

    31 Wells Gardens Rainham RM13 7LU

    Removal of existing porch. Construction of a double storey Front Extension. Provision of one off - street car parking space to the front of application property.

    1 Jul 2026 Full applications
  • P0786.26 Granted

    50 Marlborough Road Romford RM7 8AJ

    Part double and part single storey rear extension and front porch

    25 Jun 2026 Full applications