Proposal
Construction of single storey rear extensions, part two storey front and rear infill extension.
As published by the council, reference P0411.25
Timeline
Dates from the published record
-
25 Mar 2025
Received by Havering
-
28 Mar 2025
Validated
Checked as complete and ready for consideration.
-
29 Sep 2025
Decision issued: Granted subject to conditions
-
3 Aug 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Q0181.26 Decided
15 Balgores Lane Romford RM2 5JT
Ground floor rear extension, first floor front and rear extensions, new roof and front porch canopy P0391.26 Conditions(s) 3 Prior to installation of works on site, a schedule with clear photographs of the types and colour of the materials to be used in the external finishes and details including walls, roofing, doors and windows should be submitted to and approved in writing by the Local Planning Authority and thereafter the development shall be constructed with the approved materials.
-
P0540.26 Granted
40 Balgores Lane Romford RM2 5JT
Variation of condition 4 (Approved windows) of planning permission Ref:P0031.26 dated 08/04/2026 to permit clear glazing to side window (Proposed single-storey side extension would be infilling existing side projections)
-
P0391.26 Granted
15 Balgores Lane Romford RM2 5JT
Ground floor rear extension, first floor front and rear extensions, new roof and front porch canopy
-
Q0173.26 Decided
40 Balgores Lane Romford RM2 5JT
Discharge of Condition 3 of P0540.26 - materials
-
P1322.24 Withdrawn
15 Balgores Lane Romford RM2 5JT
Construction of single storey rear and side extensions, front and rear dormer extensions with rear balcony, demolition of existing garage and erection of new garage and canopy to front and rear
-
T0096.24 Granted
15 Balgores Lane Romford RM2 5JT
Tree 1 (unidentified species) is located directly behind main gate access to garden, the new owner of the property has expressed interest in having this tree felled (stump to be left 2-3 inches above ground level) Tree 2 located in rear garden next to fence is a yew tree, the property owner has expressed interest in having this tree felled (stump to be left 2-3 inches above ground level)
Other full applications applications
In Havering
-
P0917.26 Decided
Marshalls Park School, Pettits Lane Romford RM1 4EH
Condition No.4 (approved accommodation) of planning permission ref: P0559.26 dated 30/06/2026 to permit a change of wording from "Teachers" to "Educational staff only". (Erection of a two storey 6-bed detached dwelling, to provide teachers accommodation with associated parking and amenities)
-
P0576.26 Granted
13 Fleet Close Upminster RM14 1PS
Single storey side extension
-
P0534.26 Granted
15 HUGO GARDENS RAINHAM RM13 7LA
Installation of solar panels to the roof of the rear dormer
-
P0411.26 Granted
Land adjacent to 76 White Hart Lane Romford RM7 8JB
Erection of a new residential dwelling (2 Bedrooms, 3 Persons) and extension to existing crossover.
-
P0679.26 Granted
30 Farm Way Hornchurch RM12 5SS
Proposed single storey front extension. Replacement windows and external finish changed to a light, smooth render.