Planning application
280 Collier Row Lane Romford RM5 3NL
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Retention of Loft Conversion to include Hip-to-Gable Roof Conversion and Rear Dormer, Part single, part two storey side extension and Proposed First Floor Rear Extension
As published by the council, reference P0276.26
Application record
- Reference
- P0276.26
- Type
- Full
- Status
- Refuse Conditions/Reasons
- Decision
- Granted subject to conditions
- Received
- 9 Mar 2026
- Validated
- 9 Mar 2026
- Decided
- 10 Jun 2026
- Ward
- Mawneys
- Postcode
- RM5 3NL
Timeline
Dates from the published record
-
9 Mar 2026
Received by Havering
-
10 Jun 2026
Decision issued: Granted subject to conditions
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
288 Collier Row Lane Romford RM5 3NL
Proposed extension of existing drop kerb
Granted Full applications Extension 6 docs -
280 Collier Row Lane Romford RM5 3NL
Erection of rear out-building ancillary to main house.
Granted Full applications 8 docs -
310 Collier Row Lane Romford RM5 3NL
First floor rear extension
Granted Full applications Extension 6 docs -
UNIT A, 315 COLLIER ROW LANE ROMFORD RM5 3ND
100% historically approved
Redevelopment of the site to provide four self-contained flats (Use Class C3), with associated works following demolition of the existing light industrial building
Decided New dwelling Demolition -
Unit A 315 Collier Row Lane Romford RM5 3ND
Partial demolition of existing building and construction of block containing 7 self-contained flats
Granted Full applications New dwelling Demolition 9 docs -
Grass verge southeast of The Aspen Tree public house on the junction of Gobions Avenue and Havering Road Collier Row RM5 3ND
15.0m Phase 8 Monopole and associated ancillary works.
Granted Telecoms 4 docs
Other full applications applications
In Havering
-
P0738.26 Granted
3 Marlborough Gardens Upminster RM14 1SF
Single storey rear extension
-
P0675.26 Granted
182 Hainault Road Romford RM5 3AS
Demolition of existing garage and construction of a single-storey side extension to form an additional bedroom for the existing HMO. Occupancy to increase from a maximum of five persons to a maximum of six persons.
-
P0825.26 Granted
377 Havering Road Romford RM1 4BW
Single storey rear extension and access ramp
-
P0804.26 Granted
31 Wells Gardens Rainham RM13 7LU
Removal of existing porch. Construction of a double storey Front Extension. Provision of one off - street car parking space to the front of application property.
-
P0786.26 Granted
50 Marlborough Road Romford RM7 8AJ
Part double and part single storey rear extension and front porch