Planning application
APP/25/00979
7/9 London Road, Widley, Waterlooville, PO7 5AT
Proposal
Change of Use of Nos 7 and 9 London Road from Bed and Breakfast and Residential Dwelling into HMO providing temporary accommodation for local homeless people in ensuite studio rooms with shared facilities (10No. 2 bed units; 4No. 1 bed units). Proposals include the remodelling and refurbishing of the building including internal reconfigurations. The proposals also include landscaping, paving, alterations to boundary treatments, alterations to materials and fenestration and a bin and cycle store building.
As published by the council, reference APP/25/00979
Timeline
Dates from the published record
-
19 Nov 2025
Received by Havant
-
10 Jun 2026
Validated
Checked as complete and ready for consideration.
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Havant for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
APP/26/00157 Decided
28 London Road, Widley, Waterlooville, PO7 5BS
Single storey rear extension
-
26/00261/HOU Awaiting decision
1 Greenlea Close Portsmouth PO7 5BA
Construction of single storey rear extension (following removal of existing)
-
APP/26/00520 Awaiting decision
9 The Crest, Waterlooville, PO7 5DG
Proposed Single Storey Rear extension with existing garage demolished and replaced.
-
APP/26/00300 Granted
18 The Brow, Waterlooville, PO7 5BZ
Erection of a single-storey rear extension to replace existing lean-to extension
-
APP/26/00063 Granted
38 Lansdowne Avenue, Waterlooville, PO7 5BL
Single storey rear extension with steps to rear garden and loft additions including new dormers to north and south elevations and barn hip to gable roof conversion. Alterations to fenestration and external materials.
-
APP/26/00255 Granted
30 Lansdowne Avenue, Waterlooville, PO7 5BL
Application for Non Material Amendment to Planning Consent APP/21/01130. To substitute the approved external wall finishes—comprising brick, painted brick, and painted render—with cedar finish composite vertical rain screen cladding and alterations to fenestration.
Other full applications applications
In Havant
-
APP/26/00285 Granted
Unit 8A, Wellington Retail Park, 2 Hambledon Road, Waterlooville, PO7 7FG
Installation of new HVAC to Unit 8A with the incorporation of 3 No. stacked external condensing units located on the rear wall of the building.
-
APP/25/01006 Granted
6A Dornmere Lane, Waterlooville, PO7 8QH
Proposed rear garden room for child therapy use.
-
APP/25/00689 Refused
31 Serpentine Road, Widley, Waterlooville, PO7 5EE
Construction of a single storey rear extension and loft conversion, with rear dormer, in addition, construction of a single storey side extension to be used as a home office and for use as a dental practice for use by resident.
-
APP/26/00253 Granted
100 Bedhampton Road, Havant, PO9 3EZ
Single storey rear extension to dental practice.
-
APP/26/00227 Granted
Mark Anthony Court Estate , Hollow Lane, Hayling Island, PO11 0AE
The proposed development comprises the refurbishment of the roofs of all six apartment blocks within the site. The works include: Removal of existing roof coverings, Installation of a modern high-performance felt roofing system, Installation of upgraded thermal insulation, Raising of existing parapet walls by approximately 200mm.