Skip to content
PlanIndex Get alerts
Menu

Planning application

APP/25/00861

2A Scratchface Lane, Havant, PO9 3NG

Granted Havant Change of use

Proposal

Proposed change of use of outbuilding to hair/beauty salon.

As published by the council, reference APP/25/00861

Timeline

Dates from the published record

  1. 21 Oct 2025

    Received by Havant

  2. 24 Apr 2026

    Decision issued: Approve with Conditions

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • APP/26/00293 Granted

    9 Wigan Crescent, Havant, PO9 3PN

    Proposed single storey wrap around extension

    29 Apr 2026 186m away Householder
  • APP/25/00800 Granted

    47 Wigan Crescent, Havant, PO9 3PN

    Single storey side and part rear extension forming additional ground floor accommodation. Flat roofed with mansard pitched roof eaves treatment, raised patio.

    7 Oct 2025 186m away Householder
  • APP/26/00180 Awaiting decision

    45 Hulbert Road, Havant, PO9 3TA

    Demolition of existing outbuilding and construction of 1No two bedroom bungalow and garden office annex with associated car parking for two cars.

    13 Mar 2026 193m away Full applications
  • APP/26/00121 Granted

    38 Parkside, Havant, PO9 3PL

    Application for Lawful Development Certificate relating to proposed single storey rear extension to replace existing single storey rear extension, under 3 meters in depth.

    23 Feb 2026 196m away Lawful development
  • APP/26/00166 Refused

    10 Hulbert Road, Bedhampton, Havant, PO9 3TF

    1No. Macrocarpa, remove 3 largest lower lateral limbs leaning towards property, subject to TPO 0973.

    10 Mar 2026 238m away Trees
  • APP/23/00022 Granted

    Imperial Palace, 37 Belmont Grove, Havant, PO9 3PT

    Application for non-material amendment to APP/22/00379 relating to condition 2 replacement of railings to entrance ramp with brick.

    13 Jan 2023 261m away Amendments

In Havant

  • APP/26/00285 Granted

    Unit 8A, Wellington Retail Park, 2 Hambledon Road, Waterlooville, PO7 7FG

    Installation of new HVAC to Unit 8A with the incorporation of 3 No. stacked external condensing units located on the rear wall of the building.

    27 Apr 2026 Full applications
  • APP/25/01006 Granted

    6A Dornmere Lane, Waterlooville, PO7 8QH

    Proposed rear garden room for child therapy use.

    5 Dec 2025 Full applications
  • APP/25/00689 Refused

    31 Serpentine Road, Widley, Waterlooville, PO7 5EE

    Construction of a single storey rear extension and loft conversion, with rear dormer, in addition, construction of a single storey side extension to be used as a home office and for use as a dental practice for use by resident.

    28 Jul 2025 Full applications
  • APP/26/00253 Granted

    100 Bedhampton Road, Havant, PO9 3EZ

    Single storey rear extension to dental practice.

    14 Apr 2026 Full applications
  • APP/26/00227 Granted

    Mark Anthony Court Estate , Hollow Lane, Hayling Island, PO11 0AE

    The proposed development comprises the refurbishment of the roofs of all six apartment blocks within the site. The works include: Removal of existing roof coverings, Installation of a modern high-performance felt roofing system, Installation of upgraded thermal insulation, Raising of existing parapet walls by approximately 200mm.

    2 Apr 2026 Full applications