Planning application
APP/24/01027
Land at Northney Farm, south and west of Northney Road, Hayling Island, PO11 0RX
Proposal
Proposed siting, design and external appearance of a polytunnel and a metal storage container for the purposes of cut flower growing.
As published by the council, reference APP/24/01027
Timeline
Dates from the published record
-
25 Nov 2025
Received by Havant
-
20 Jan 2026
Decision issued: Approve with Conditions
-
26 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
APP/23/00033 Granted
Nutwood, St Peters Road, Hayling Island, PO11 0RX
Pollard/reduce height of various deciduous trees on southern border of property to eaves level of property, within Conservation Area St Peters.
-
APP/26/00058 Granted
Copper Lodge, Church Lane, Hayling Island, PO11 0SB
T1 - Mimosa - fell - due to declining health and poor specimen. Tree within the St Peter's Conservation Area.
-
APP/21/00651 Granted
Craigower, Church Lane, Hayling Island, PO11 0SB
T1 on plan, 1No. Pittosporum - Reduce by approx 2 - 2.5 metres to leave a standing height of approx 5 metres, crown width of approx 3.5 metres and crown lift to 3 metres. T2 on plan 1No. Hawthorn - Reduce top by approx 4 metres and sides by 2.5 metres to leave a standing height of approx 5 metres and crown width of approx 3.5 metres. T3 on plan 1No. Multi Stem Bay - Reduce top by approx 4 metres and sides by 2.5 metres to leave a standing height of approx 5 metres and crown width of approx 2 metres. Remove any dead, crossing or epicormic branches from all above trees to maintain trees at a sensible size, within Conservation Area of St Peter's.
-
APP/23/00074 Granted
Craigower, Church Lane, Hayling Island, PO11 0SB
1No. Norway maple reduce back to old pruning points; Remove 1No. Conifer; within conservation area of St Peters.
-
APP/26/00352 Awaiting decision
The Brents, St Peters Road, Hayling Island, PO11 0RT
26x Conifers (has been kept as a hedge) remove. Trees within the St Peter's Conservation Area.
-
APP/26/00196 Granted
Laburnums, St Peters Road, Hayling Island, PO11 0RT
Variation of Condition 5 of planning application APP/24/00017 to alter the approved external materials.
Other full applications applications
In Havant
-
APP/26/00285 Granted
Unit 8A, Wellington Retail Park, 2 Hambledon Road, Waterlooville, PO7 7FG
Installation of new HVAC to Unit 8A with the incorporation of 3 No. stacked external condensing units located on the rear wall of the building.
-
APP/25/01006 Granted
6A Dornmere Lane, Waterlooville, PO7 8QH
Proposed rear garden room for child therapy use.
-
APP/25/00689 Refused
31 Serpentine Road, Widley, Waterlooville, PO7 5EE
Construction of a single storey rear extension and loft conversion, with rear dormer, in addition, construction of a single storey side extension to be used as a home office and for use as a dental practice for use by resident.
-
APP/26/00253 Granted
100 Bedhampton Road, Havant, PO9 3EZ
Single storey rear extension to dental practice.
-
APP/26/00227 Granted
Mark Anthony Court Estate , Hollow Lane, Hayling Island, PO11 0AE
The proposed development comprises the refurbishment of the roofs of all six apartment blocks within the site. The works include: Removal of existing roof coverings, Installation of a modern high-performance felt roofing system, Installation of upgraded thermal insulation, Raising of existing parapet walls by approximately 200mm.