Skip to content
PlanIndex Get alerts
Menu

Planning application

100 Southleigh Road, Havant, PO9 2PR

Granted Havant APP/11/01339 Full Planning Permission

Works: Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of replacement detached garage following demolition of existing garage. Construction of 2m boundary wall to front boundaries and south east side boundary. New vehicle access to Marlborough Park. (Alteration of existing pedestrian access.)

As published by the council, reference APP/11/01339

Application record

Reference
APP/11/01339
Type
Full Planning Permission
Status
Decided
Decision
Grant perm/consent/certify lawfulness
Received
9 Aug 2011
Validated
7 Sep 2011
Decided
6 Jan 2012
Ward
St Faiths
Decision by
Delegated
Postcode
PO9 2PR

Timeline

Dates from the published record

  1. 9 Aug 2011

    Received by Havant

  2. 7 Sep 2011

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jan 2012

    Decision issued: Grant perm/consent/certify lawfulness

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Marlborough Park, Havant, PO9 2PP

    APP/23/00029 Submitted 16 Jan 2023 83m away

    Removal of existing textured render to façade & replacement with new smooth render from ground to first floor & weatherboarding from first floor to eaves. Removal of existing bay window to rear elevation & replacement with bifold door with level threshold to new composite decking in rear garden. Replacement of existing uPVC french door at ground floor to rear elevation with new aluminium french door (size & type to match existing).

    Granted Householder Windows or glazing 7 docs
    Domestic
  • 15 Marlborough Park, Havant, PO9 2PP

    APP/26/00261 Submitted 16 Apr 2026 83m away

    Certificate of Lawfulness for Proposed single storey rear extension and alterations to the fenestration in the East (side) elevation.

    Granted Lawful development Extension Windows or glazing 7 docs
    Small domestic
  • 26 Hornbeam Road, Havant, PO9 2UT

    APP/10/00595 Submitted 2 Sep 2010 129m away

    Rear conservatory.

    Withdrawn Full applications Extension 6 docs
  • 15 Bladon Close, Havant, PO9 2QA

    APP/11/01355 Submitted 15 Aug 2011 129m away

    Fell 1No. Beech tree subject to TPO 1279 and replace with smaller tree/shrub.

    Refused Trees 2 docs
  • 80 Southleigh Road, Havant, PO9 2QL

    APP/24/00515 Submitted 4 Jul 2024 135m away

    Hip to gable and rear dormer, plus enlarged front dormer roof extension. Front infill to entrance recess. Replacement garage.

    Granted Householder Extension Loft or dormer 14 docs
    Domestic
  • 114 Southleigh Road, Havant, PO9 2PS

    APP/26/00628 Submitted 26 Aug 2026 139m away

    89% historically approved · decision due ~21 Oct

    T1 - Sycamore - crown reduce by 2.5M in height and 2M width. Tree subject to TPO 1279

    Awaiting decision Trees 3 docs

In Havant

  • APP/26/00107 Granted

    Flat 37, Dene Court, 38 Holman Close, Waterlooville, PO8 8HD

    Change of use of Housing Manager's Flat to create 1No. age restricted two bedroom flat.

    17 Feb 2026 Full applications
  • APP/25/00697 Withdrawn

    24 Palmers Road, Emsworth, PO10 7DL

    CoU from body coach works purposes (B2) to use as storage (B8) with a small showroom for viewing Window and Door units manufactured by others for both domestic and commercial use to include the storage and display of products for use in the building/construction trades including but not limited to window and door units and associated office use.

    3 Sep 2025 Full applications
  • APP/26/00638 Awaiting decision

    Havant Railway Station, North Street, Havant, PO9 1PP

    Hampshire County Council Consultation for Discharge of Condition 13 of APP/25/01004 (Pre-construction - Materials, Finishes, Paintwork, Privacy and Security Measures). Consultation response requested by 14/09/2026.

    24 Aug 2026 Full applications
  • APP/26/00592 Awaiting decision

    Garden Centre, Bartons Road, Havant, PO9 5NA

    Retrospective planning application for the extension of existing car wash to provide 1no additional parasol, cladding to existing office unit and boundary fence.

    14 Aug 2026 Full applications
  • APP/25/00860 Granted

    The Bellair Club, 2 Bellair Road, Havant, PO9 2RG

    Extension to the club room for social use on eastern side and extension to form new disabled and ladies toilet facility on the northern side.

    21 Oct 2025 Full applications