Skip to content
PlanIndex Get alerts
Menu

Planning application

85 Hulbert Road, Havant, PO9 3TB

Granted Havant APP/10/00765 Full Planning Permission

Works: Extension Loft or dormer Roofing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two storey rear extension. New front dormer. Replacement roof with 6No. rooflights.

As published by the council, reference APP/10/00765

Application record

Reference
APP/10/00765
Type
Full Planning Permission
Status
Decided
Decision
Grant perm/consent/certify lawfulness
Received
18 Oct 2010
Validated
27 Jan 2011
Decided
23 Mar 2011
Ward
Bedhampton
Decision by
Delegated
Postcode
PO9 3TB

Timeline

Dates from the published record

  1. 18 Oct 2010

    Received by Havant

  2. 27 Jan 2011

    Validated

    Checked as complete and ready for consideration.

  3. 23 Mar 2011

    Decision issued: Grant perm/consent/certify lawfulness

  4. 2 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

35 applications on PlanIndex · across 3 councils · 65% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 53A-55 Hulbert Road, Havant, PO9 3TB

    APP/10/00520 Submitted 16 Aug 2010 0m away

    Emergency power generator located to the rear of the bicycle store.

    Granted Full applications 5 docs
  • 85 Hulbert Road, Havant, PO9 3TB

    APP/22/00883 Submitted 10 Sep 2022 0m away

    Single storey front extension to garage with new front dormer above and open porch.

    Granted Householder Extension Loft or dormer 11 docs
    Small domestic
  • 53 Hulbert Road, Havant, PO9 3TB

    APP/26/00438 Submitted 12 Jun 2026 0m away

    Proposed Two Storey / Single Storey Rear And Side Extension, Replacement Front Porch & Detached Garden Building. Additional alterations to fenestrations.

    Granted Householder Extension 7 docs
    Small domestic
  • 75 Hulbert Road, Havant, PO9 3TB

    APP/21/00631 Submitted 14 Jun 2021 0m away

    Application for non-material change to Planning Permission APP/20/00602 relating to amendments to eaves height, total height as approved annexe.

    Granted Amendments 5 docs
  • 53A - 55 Hulbert Road, Havant, PO9 3TB

    APP/10/00738 Submitted 12 Oct 2010 0m away

    Four additional high level, obscure glazed rooflight windows on the southern elevation. (Retrospective.)

    Granted Full applications Loft or dormer Windows or glazing 7 docs
  • 53A-55 Hulbert Road, Havant, PO9 3TB

    APP/11/01094 Submitted 3 Jun 2011 0m away

    Crown reduce by 2.5m overall, crown lift to 5m, remove crossing branches and deadwood 1No. Macrocarpa tree (T3) subject to TPO 1874.

    Granted Trees 2 docs

In Havant

  • APP/26/00487 Granted

    Pavement opp Lidl Somborne Drive Havant PO9 5AN

    Installation of 1no. new BT Street Hub and 1no. associated BT Phone Kiosk removal.

    6 Jul 2026 Full applications
  • APP/26/00201 Refused

    1 Hinton Close, Havant, PO9 4BL

    Change of use from C3 dwelling to Sui generis 8 Bedroom 8 Person HMO. The work also includes a 2 storey side extension and a ground floor rear extension.

    25 Mar 2026 Full applications
  • APP/26/00107 Granted

    Flat 37, Dene Court, 38 Holman Close, Waterlooville, PO8 8HD

    Change of use of Housing Manager's Flat to create 1No. age restricted two bedroom flat.

    17 Feb 2026 Full applications
  • APP/25/00697 Withdrawn

    24 Palmers Road, Emsworth, PO10 7DL

    CoU from body coach works purposes (B2) to use as storage (B8) with a small showroom for viewing Window and Door units manufactured by others for both domestic and commercial use to include the storage and display of products for use in the building/construction trades including but not limited to window and door units and associated office use.

    3 Sep 2025 Full applications
  • APP/26/00638 Awaiting decision

    Havant Railway Station, North Street, Havant, PO9 1PP

    Hampshire County Council Consultation for Discharge of Condition 13 of APP/25/01004 (Pre-construction - Materials, Finishes, Paintwork, Privacy and Security Measures). Consultation response requested by 14/09/2026.

    24 Aug 2026 Full applications