Skip to content
PlanIndex Get alerts
Menu

Planning application

3 The Beeches, St Leonards-on-sea, TN37 7TU

Granted Hastings HS/FA/26/00380

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New aluminium (grey) bifold doors to rear elevation, replacing existing uPVC french doors and adj...

As published by the council, reference HS/FA/26/00380

Application record

Reference
HS/FA/26/00380
Status
Decided
Decision
GRANTED PERMISSION
Received
19 Jun 2026
Validated
19 Jun 2026
Decided
17 Aug 2026
Ward
ASHDOWN
Postcode
TN37 7TU

Site history

Applications at this address on the Hastings register

This site has had 2 applications since 2026: 1 approved, 1 refused.

  • HS/PR/26/00252 Refused

    3 The Beeches, St Leonards-on-sea, TN37 7TU

    Application for a Certificate of Proposed Lawful development for the installation of grey aluminium bi-fold doors to the ground floor rear elevation (amended description)

    Decided 10 Jun 2026 Lawful development

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by Hastings

  2. 25 Jul 2026

    Added to PlanIndex

  3. 17 Aug 2026

    Decision issued: GRANTED PERMISSION

  4. 23 Aug 2026

    Status changed to Decided

    Previously Registered.

Who's behind it

Company information only, from the register and Companies House

De Novo Associates Ltd Agent, registered in St. Leonards-On-Sea

Active · incorporated 2023 · St. Leonards-On-Sea

15 applications on PlanIndex · across 4 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

  • FINAL DELEGATED REPORT Report · 17 Aug 2026
  • WASTE MANAGEMENT STATEMENT Other · 22 Jun 2026
  • LOCATION AND BLOCK PLAN, EXISTING AND PROPOSED FLOOR PLANS AND ELEVATIONS Drawing · 22 Jun 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Hastings granted permission on 17 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Hastings's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 3 The Beeches, St Leonards-on-sea, TN37 7TU

    HS/PR/26/00252 Submitted 23 Apr 2026 0m away

    Application for a Certificate of Proposed Lawful development for the installation of grey aluminium bi-fold doors to the ground floor rear elevation (amended description)

    Refused Lawful development Windows or glazing 3 docs
  • 17 Eisenhower Drive, St Leonards-on-sea, TN37 7TQ

    HS/FA/26/00114 Submitted 27 Feb 2026 134m away

    Integral garage conversion, garage door replaced with new window and entrance door to enable level/disabled access from driveway, window to replace side door.

    Granted Householder Windows or glazing 2 docs
    Small domestic
  • 24 Truman Drive, St Leonards-on-sea, TN37 7TH

    HS/TP/25/00622 Submitted 17 Oct 2025 232m away

    T1 Oak - Crown lift to 4 linear metres and reduce lateral branches from dwelling by 4 linear metres

    Granted Trees 3 docs
    Domestic
  • 6 St Kitts Close, St Leonards-on-sea, TN37 7TB

    HS/TP/21/00590 Submitted 11 Jun 2021 239m away

    T1 Oak - Crown reduce by 3-4 metres T2 Oak - Reduce lateral branches by 3-4 metres

    Granted Trees 7 docs
  • 21 Beauport Home Farm Close, St Leonards-on-sea, TN37 7BW

    HS/LB/26/00339 Submitted 8 Jun 2026 240m away

    87% historically approved · decision due ~20 Aug

    Installation of an electric vehicle charger on a post in front of small front wall to driveway.

    Awaiting decision 4 docs
  • 40 Beauport Home Farm Close, St Leonards-on-sea, TN37 7BW

    HS/TP/25/00495 Submitted 14 Aug 2025 240m away

    T1 and T2 Oak - Crown lift to 6 linear metres

    Granted Trees 3 docs