Skip to content
PlanIndex Get alerts
Menu

Planning application

55 Magdalen Road, St Leonards-on-sea, TN37 6EU

Granted Hastings HS/FA/26/00175 Householder

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey side extension & single storey rear extension including other internal works and adjustments to rear facing windows.

As published by the council, reference HS/FA/26/00175

Application record

Reference
HS/FA/26/00175
Type
Householder
Status
Decided
Decision
Granted As published: GRANTED PERMISSION
Received
25 Mar 2026
Validated
25 Mar 2026
Decided
8 May 2026
Ward
GENSING
Decision by
DELEGATED
Postcode
TN37 6EU

Timeline

Dates from the published record

  1. 25 Mar 2026

    Received by Hastings

  2. 8 May 2026

    Decision issued: GRANTED PERMISSION

  3. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

SWG Designs South East Ltd Agent, a design practice registered in St. Leonards-On-Sea

Active · incorporated 2019 · St. Leonards-On-Sea

45 applications on PlanIndex · across 8 councils · 82% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

The council's own list, drawings first

6 documents on file for this application

Drawings (2)

  • Proposed plans 26 Mar 2026
  • Existing plans 26 Mar 2026

Everything on file (6)

  • COUNTY ARCHAEOLOGY Consultee Comment · 08 May 2026
  • HIGH WEALD AONB STANDING ADVICE Consultee Comment · 08 May 2026
  • HIGH WEALD AONB Consultee Comment · 08 May 2026
  • FINAL DELEGATED REPORT Report · 08 May 2026
  • PROPOSED PLANS Drawing · 26 Mar 2026
  • EXISTING PLANS Drawing · 26 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Hastings granted permission on 8 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Hastings

  • HS/FA/26/00281 Granted

    Pine Crest, 82 Pine Avenue, Hastings, TN34 3PR

    Proposed replacement single story rear extension.

    Received 11 May, published by the council 25 Jul 2026 Householder
  • HS/FA/26/00437 Granted

    23 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace internal timber frame, and finished with external white rainscreen cladding to the side elevation (retrospective)

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00440 Granted

    85 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace the internal timber frame, and finished with external white rainscreen cladding to the side elevation (retrospective)

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00439 Granted

    65 Farley Bank, Hastings, TN35 5QA

    Remove the damaged gable end masonry above the eaves and repair/replace the internal timber frame, finished with external white rainscreen cladding to the side elevation.

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00438 Granted

    45 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace internal timber frame, and finished with external white rainscreen cladding to the side elevation.

    Received 17 Jul, published by the council 19 Aug 2026 Householder