Planning application
Land Adjacent, 74 Kenilworth Road, St Leonards-on-sea
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of conditions: 3 (materials); 6 (drainage drawings and calculations); 9 (soft landscaping); 12 (hard landscaping) and 18 (protective fencing) of Planning permission HS/FA/20/00384
As published by the council, reference HS/CD/21/00636
Application record
- Reference
- HS/CD/21/00636
- Type
- Discharge of Conditions
- Status
- Decided
- Decision
- GRANTED PERMISSION
- Received
- 2 Jul 2021
- Validated
- 2 Jul 2021
- Decided
- 8 Sep 2021
- Ward
- CENTRAL ST LEONARDS
- Decision by
- DELEGATED
Timeline
Dates from the published record
-
2 Jul 2021
Received by Hastings
-
8 Sep 2021
Decision issued: GRANTED PERMISSION
-
10 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: HS/FA/20/00384 (Decided)
Who's behind it
Company information only, from the register and Companies House
Patrick Davey Architect Agent, an architecture practice
3 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
- CONSERVATION
- PROPOSED SITE PLAN
- PROPSED SECTONS & NOTES
- WEBER RENDER & DECORATIVE FINISHES DETAILS
- ALUMINIUM RAINWATER SYSTEM DETAILS
- STAINLESS STEEL BARRACUDA WALL LIGHT DETAILS
- MANROSE VENT DETAILS
- WEBER PRAL CHALK SAMPLE
- BOROUGH ARBORICULTURIST
- SOUTHERN WATER MAP
- SOUTHERN WATER PLAN
- CONSERVATION
- SUDS
- PROPOSED SITE PLAN
- PROPOSED ELEVATIONS
- PROPOSED G.A SECTION
- PROPOSED SECTIONS
- DISCHARGE OF CONDITIONS LETTER
- TREE PROTECTION PLAN
- LANDSCAPING PLAN
- BADGER MITIGATION LETTER
- DRAINAGE CALCULATIONS
- SITE PLAN SHOWING DRAINAGE SCHEME
- DRAINAGE DETAILS 1
- DRAINAGE DETAILS 2
- SOUTHERN WATER SITE PLAN - 15.04.21
- SOUTHERN WATER LETTER DATED 28.04.21
- RETAINING WALL DESIGN
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hastings granted permission on 8 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Hastings
-
HS/CD/26/00213 Granted
1 Edinburgh Road, St Leonards-on-sea, TN38 8HH
Discharge of condition 6 (drainage details) of Planning Permission HS/FA/24/00460
-
HS/CD/25/00316 Granted
Land to the Rear of 419 to 447 Bexhill Road, St Leonards-on-sea, TN38 8AR
Discharge of conditions 2 (materials), 5 (construction environmental management plan) and 6 (method statement for translocation of protected species) of Reserved Matters HS/DS/22/00912
-
HS/CD/26/00220 Withdrawn
Offices and Premises, 9 Wellington Square, Hastings, TN34 1PB
Discharge of conditions: 4 (window and door details), 5 (drainage/surface run details), 7 (ventilation/extraction details) and 10 (paving finishes refuse storage unit and access gate details) of Listed Building Consent HS/LB/25/00132
-
HS/CD/26/00217 Withdrawn
Offices and Premises, 9 Wellington Square, Hastings, TN34 1PB
Discharge of conditions: 3 (material and colour specification); 4 (drainage details), 8 (details of external paving, refuse storage and access gate), 10 (ventilation and extraction details), 11 (window and door details), 13 (asbestos survey) and 17 (CCTV drain survey) of Planning Permissions HS/FA/25/00131
-
HS/CD/25/00315 Granted
Land to the Rear of 419 to 447 Bexhill Road, St Leonards-on-sea, TN38 8AR
Discharge of conditions: 9 (Construction Traffic Management Plan), 12 (drainage details), 14 (surface water details), 16 (drainage system maintenance and management),17 (flood risk during construction), 19 (site characterisation investigation and risk assessment), 20 (remediation scheme) and 23 (construction environmental management plan) of Outline Permission HS/OA/19/00153