LAND NEAR SHERATON HALL FARM SHERATON DURHAM

Granted Hartlepool D/2024/0040 Discharge of condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions 6 (Part A) , 7, 9 and 14 of planning permission H/2021/0312 (Appeal Reference: APP/H0724/W/22/3299842) Construction of underground electricity cables, and associated infrastructure to connect Sheraton Hall Solar Farm to the primary proposed substation - Durham County Council reference DM/20/03722/FPA.

As published by the council, reference D/2024/0040

Application record

Reference
D/2024/0040
Type
Discharge of condition
Status
Permitted
Decision
Granted As published: DISAPP (Approved)
Received
24 Sep 2024
Validated
24 Sep 2024
Decided
21 Oct 2024

Site history

Applications at this address on the Hartlepool register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • D/2024/0044 Granted

    LAND NEAR SHERATON HALL FARM SHERATON DURHAM

    Discharge of condition 8 of planning permission H/2021/0312 (Appeal Ref: APP/H0724/W/22/3299842) Construction of underground electricity cables, and associated infrastructure to connect Sheraton Hall Solar Farm to the primary proposed substation - Durham County Council reference DM/20/03722/FPA)

    Decided 8 Nov 2024 Conditions

Timeline

Dates from the published record

  1. 24 Sep 2024

    Received by Hartlepool

  2. 21 Oct 2024

    Decision issued: DISAPP (Approved)

  3. 23 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hartlepool granted permission on 21 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Hartlepool

  • D/2026/0045 Decided

    ST HELENS PRIMARY SCHOOL DURHAM STREET HARTLEPOOL TS24 0HG

    Discharge of conditions 13 (external illumination), 14 (electric vehicle charging apparatus), 17 (hard landscaping) and 24 (fume extraction system) of planning permission H/2025/0181 (Demolition of existing buildings and erection of a new two storey school building and associated car parking, cycle parking, landscaping, hard courts, playing field, external canopies, bin store and substation)

    Received 17 Sep, published by the council 27 Sep 2026 Conditions
  • H/2026/0005 Granted

    THE HOUR GLASS EAGLESFIELD ROAD HARTLEPOOL TS25 4BS

    Section 73 application to vary condition 2 (Approved Plans) 4 (soft landscaping), 5 (hard landscaping) and 10 (bird nesting bricks) of planning permission H/2023/0297 (Technical Details consent for the erection of 5 No Bungalow dwellings following permission in principle of planning application H/2022/0258) to allow changes to Plot 5 dwelling.

    Received 12 Jan, published by the council 21 Jul 2026 Conditions
  • D/2026/0044 Decided

    WHELLY HILL FARM WORSET LANE HART HARTLEPOOL TS27 3BH

    Discharge of conditions 8 (levels), 12 (external finishes) and 14 (hard landscaping) of planning permission H/2022/0459 (Proposed Construction, Operation and Maintenance of a Battery Energy Storage System (BESS) Facility and Associated Infrastructure)

    Received 7 Sep, published by the council 14 Sep 2026 Conditions
  • D/2026/0043 Decided

    WHELLY HILL FARM WORSET LANE HART HARTLEPOOL TS27 3BH

    Discharge of conditions 3 (landscaping), 4 (temporary construction access), 6 (BNG plan), 7 (CEMP) and 11 (drainage) of planning permission H/2022/0459 Proposed Construction, Operation and Maintenance of a Battery Energy Storage System (BESS) Facility and Associated Infrastructure

    Received 4 Sep, published by the council 14 Sep 2026 Conditions
  • D/2026/0042 Decided

    THE UNIVERSITY HOSPITAL OF HARTLEPOOL HOLDFORTH ROAD HARTLEPOOL TS24 9AH

    Discharge of condition 5 (Remediation Scheme) of planning permission H/2025/0417 (Section 73 application to vary conditions 2 (approved plans), 4 (soft landscaping), 7 (external materials) and 8 (boundary treatments) of planning permission H/2025/0005 (Erection of a ground source heat pump building and associated erection of a 19.5 metre high dispersion stack) to allow alterations to approved layout and increased width of dispersion stack)

    Received 2 Sep, published by the council 14 Sep 2026 Conditions