Planning application
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
T3. English Oak - Remove large dead branch overhanging public area towards the church.
As published by the council, reference 26/01538/CA
Application record
- Reference
- 26/01538/CA
- Status
- Decided
- Validated
- 14 Sep 2026
- Postcode
- RG27 8ED
Site history
Applications at this address on the Hart register
This site has had 4 applications since 2023: 1 approved, 0 refused.
-
26/01652/FUL Awaiting decision
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
Installation of ASHPs to the exterior of the church with associated fencing
-
26/01646/FUL Awaiting decision
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
Replacement of security grille to existing opening by in-fill brick and stone work and new window
-
23/01339/FUL Granted
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
Replace the current solar panels, hidden on an area of flat roof set down from the surrounding pitched roofs, with the more efficient, new panels. Installation of 89 solar panels across the south-facing, rear roofs of the church.
Timeline
Dates from the published record
-
14 Sep 2026
Validated
Checked as complete and ready for consideration.
-
14 Sep 2026
Added to PlanIndex
-
23 Oct 2026
Status changed to Decided
Previously Registered.
After the decision
Hart has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Hart's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
85% historically approved · decision due ~18 Dec
Installation of ASHPs to the exterior of the church with associated fencing
Awaiting decision Full applications -
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
85% historically approved · decision due ~7 Dec
Replacement of security grille to existing opening by in-fill brick and stone work and new window
Awaiting decision Full applications Windows or glazing -
St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED
Replace the current solar panels, hidden on an area of flat roof set down from the surrounding pitched roofs, with the more efficient, new panels. Installation of 89 solar panels across the south-facing, rear roofs of the church.
Granted Full applications 17 docs -
2 Old School Close Hartley Wintney Hook Hampshire RG27 8HQ
Full width dormer Loft Conversion to rear of property with 3 windows. 3 x velux on front facing roof
Decided Outline Loft or dormer Windows or glazing 5 docs -
On The Common Cricket Green Lane Hartley Wintney Hook Hampshire RG27 8PH
G1 - Fell dying conifer hedge T1 - Reduce one holly by 3m and trim all round for low light levels T2 - Reduce one cypress by 3m and trim all round for low light levels and over hanging neighbours access drive T3 - Reduce conifer next to beech by 3m and remove one limb over access drive low light levelsand close proximity to beech tree T4 - Thin beech and lift garden side only by 4m due to low light levels and extremely dence canopy T5 - Reduce small conifer by 3m to stop encroachment into honey locust
Granted Trees 3 docs -
On The Common Cricket Green Lane Hartley Wintney Hook Hampshire RG27 8PH
Honey Locust Tree - we would like to trim back the branches of the honey locust tree on the property adjacent to us by 4ft
Granted Trees 4 docs