Planning application
Titcheners 15 High Street Odiham Hampshire RG29 1LE
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
- Remove and dispose of the existing suspended oak engineered floorboards and existing lambswool insulation and supportive netting in two ground floor rooms and the wc - Apply insecticide spray to the underfloor space - Install hemp mat insulation and supportive netting in the underfloor space - Lay new tongue-and-groove oak engineered floorboards - Replace skirting boards that have been damaged during the works with plain square edge boards and paint white to match existing skirting elsewhere in the cottage
As published by the council, reference 26/01410/LBC
Application record
- Reference
- 26/01410/LBC
- Category
- Heritage and listed buildings
- Status
- Registered
- Validated
- 25 Aug 2026
- Ward
- Odiham
- Parish
- Odiham
- Decision by
- Delegated
- Postcode
- RG29 1LE
Timeline
Dates from the published record
-
25 Aug 2026
Validated
Checked as complete and ready for consideration.
-
25 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hart took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Hart for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
1 High Street Odiham Hook RG29 1LE
Replace oak cladding with painted render pursuant to 03/00822/DCON and 03/00822/FUL Erection of single dwelling.
Decided Conditions 3 docsDomestic -
Blacksmiths 6 High Street Odiham Hook Hampshire RG29 1LG
Roof repairs to correct water ingress and areas of nail fatigue
Decided Outline 6 docs -
The Old Angel Inn 4 High Street Odiham Hook Hampshire RG29 1LG
Approval of condition 3 - paint - pursuant to 20/01171/LBC Remove sand and cement render from the front of the property. Apply new lime render to the front of the property. Apply Keim Mineral Paint to the new lime render on the front of the property. Repair the render on the two side elevations. Redecorate the doors and windows on the front and two side elevations. Change the colour of the main front door from bright red to an olive green colour
Decided Conditions Windows or glazing 4 docs -
The White House 36 High Street Odiham Hook Hampshire RG29 1LG
Approval of Conditions 2-window, doors and glazing panels- 3- materials- 4- internal alterations- 5- rainwater goods-6- method statement for creation of opening- 7- details of proposed insulation- 8- details of proposed stud wall- 9- method statement for vertical tongue and matchboard- and 10- method statement for roof works- pursuant to 20/00320/LBC Conversion of existing outbuilding to form a games room to the northern part and a gym with office space to the south. Replacement of existing timber doors and insertion of glazed screens. Creation of new internal openings. Re-configuration of existing w.c./store area and insertion of timber studwork.
Split decision Conditions Windows or glazing 6 docs -
The White House 36 High Street Odiham Hook Hampshire RG29 1LG
Approval of Conditions 3- window, doors and glazing panels- 4- materials- and 5- rainwater goods- pursuant to 20/00319/HOU Conversion of existing outbuilding to form a games room to the northern part and a gym with office space to the south. Replacement of existing timber doors and insertion of glazed screens. Creation of new internal openings. Re-configuration of existing w.c./store area and insertion of timber studwork.
Split decision Conditions Windows or glazing 6 docs -
12 High Street Odiham Hook Hampshire RG29 1LG
1. T1 Robinia - Reduce in height by up to 2 metres to suitable growth points and reduce lateral spread by up to 1.5 metres.
Granted Trees 6 docs
Other heritage and listed buildings applications
In Hart
-
26/00862/LBC Withdrawn
Rowleys Frog Lane Rotherwick Hook Hampshire RG27 9BE
Erection of extensions and alterations
-
26/01389/LBC Awaiting decision
Poulters Bridge Listed Watery Lane Church Crookham Fleet Hampshire GU51 5SX
Repair, renew and refurbish canal infrastructure associated with Poulters Bridge and the adjacent canal structures (wing walls).
-
26/00081/LBC Granted
Little Church Farm Mattingley Green Mattingley Hook Hampshire RG27 8LA
Splicing in of new timber to a lower section of structural column to the Barn
-
26/01406/LBC Awaiting decision
Eversley Cross House Eversley Cross Eversley Hook Hampshire RG27 0NS
Repair, alteration and refurbishment of an existing stable block to provide an improved car workshop area and ancillary spaces for use by the main house
-
26/01337/LBC Awaiting decision
The Old Chapel The Street Long Sutton Hook RG29 1SR
Replacement front porch, minor internal alteration to remove short lengths of partition, erection of two new facings to existing partitions, removal of modern cupboards and installation of new services throughout