Skip to content
PlanIndex Get alerts
Menu

Planning application

Rowan Farm Lord Wandsworth College Long Sutton Hook Hampshire RG29 1UG

Granted Hart 26/00292/HOU Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of land from agricultural to residential and installation of a home use sauna.

As published by the council, reference 26/00292/HOU

Application record

Reference
26/00292/HOU
Type
Full Application
Status
Grant
Decision
Granted As published: Grant
Received
18 Feb 2026
Validated
11 Mar 2026
Decided
22 Apr 2026
Ward
Odiham
Parish
Long Sutton
Decision by
Delegated Decision
Postcode
RG29 1UG

Site history

Applications at this address on the Hart register

This site has had 4 applications since 2022: 4 approved, 0 refused.

  • 26/00292/FUL Granted

    Rowan Farm Lord Wandsworth College Long Sutton Hook Hampshire RG29 1UG

    Change of use of land from agricultural to residential and installation of a home use sauna.

    Decided 22 Apr 2026 Full applications
  • 22/01595/FUL Granted

    Rowan Farm Lord Wandsworth College Long Sutton Hook Hampshire RG29 1UG

    Retention of an oak framed general store

    Decided 24 Oct 2022 Full applications
  • 22/01537/FUL Granted

    Rowan Farm Lord Wandsworth College Long Sutton Hook Hampshire RG29 1UG

    Extension of log store (retrospective)

    Decided 12 Oct 2022 Full applications

Timeline

Dates from the published record

  1. 18 Feb 2026

    Received by Hart

  2. 11 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Apr 2026

    Decision issued: Grant

  4. 26 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Hart granted permission on 22 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Hart

  • 26/01799/FUL Awaiting decision

    Tylney Hall Ridge Lane Rotherwick Hook RG27 9AZ

    Erection of extension within walled garden and replacement of perimeter wall

    Full applications
  • 26/01821/FUL Awaiting decision

    The Elvetham Hotel Fleet Road Hartley Wintney Hook RG27 8AR

    Temporary permission for the siting of 2 no. marquees for events and functions at the hotel

    Full applications
  • 26/01652/FUL Awaiting decision

    St Johns Church Fleet Road Hartley Wintney Hook Hampshire RG27 8ED

    Installation of ASHPs to the exterior of the church with associated fencing

    Full applications
  • 26/01759/FUL Awaiting decision

    Dorneys Chequers Lane Eversley Hampshire RG27 0NT

    Erection of a two-storey self-build detached dwelling and detached garage with parking, landscaping and all associated works

    Full applications
  • 26/01767/FUL Awaiting decision

    The Old Dairy The Street Long Sutton Hampshire RG29 1TQ

    Demolition of existing commercial building and erection of 5 dwellings

    Full applications