Proposal
Repairs to timber-framed barn (listed Grade II) Installation of new timber barn doors Rectification of unauthorised works to building (refs 25/01364/HOU & 25/01365/LBC)
As published by the council, reference 26/00291/PREAPP
Timeline
Dates from the published record
-
18 Feb 2026
Received by Hart
-
25 Jun 2026
Decision issued: Opinion Issued
-
26 Jul 2026
Added to PlanIndex
After the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
25/00863/FUL Awaiting decision
Land Rear Of Holt Farm Holt Lane Hook
Installation of a solar park to export up to 22 MW (AC) electricity, comprising photovoltaic panels and associated infrastructure including site access
-
25/01365/LBC Refused
The Barn Holt Lane Hook Hampshire RG27 9ER
Retrospective application for: 1. Structural stabilisation of the timber frame within the barn 2. Renewed roof covering over the barn; 3. Thermal upgrade of roof structure over the barn 4. New shutter door to the east aisle entrance of the barn; 5. Repointing of brickwork to the barn 6. Replacement of rainwater goods on the barn 7. Replacement of windows to the east range 8. New glazed opening to the east range 9. Installation of an air source heat pump 10. Installation of solar panels to the south facing roof slopes of the east range 11. Installation of CCTV cameras and a broadband panel
-
25/01364/HOU Refused
The Barn Holt Lane Hook Hampshire RG27 9ER
Retrospective application for: 1. Structural stabilisation of the timber frame within the barn 2. Renewed roof covering over the barn; 3. Thermal upgrade of roof structure over the barn 4. New shutter door to the east aisle entrance of the barn; 5. Repointing of brickwork to the barn 6. Replacement of rainwater goods on the barn 7. Replacement of windows to the east range 8. New glazed opening to the east range 9. Installation of an air source heat pump 10. Installation of solar panels to the south facing roof slopes of the east range 11. Installation of CCTV cameras and a broadband panel
-
26/00644/FUL Granted
Unit 3 Bartley Junction Bartley Way Hook RG27 9UL
Installation of ventilation ducting
-
26/00139/FUL Granted
Unit 3 Bartley Junction Bartley Way Hook RG27 9UL
Change of use of part of ground floor from flexible commerncial, business and service uses (Land Use Classes B2/B8/E(g)(i)-(iii)) to sale of hot food/drink for consumption (mostly) on the premises (Land Use Class E(b))
-
25/02256/ADV Granted
Bartley Junction Bartley Way Hook
Display of 1no. freestanding totem sign.
Other outline applications
In Hart
-
26/01115/PREAPP Decided
Foxglove Cottage 7 Farnham Road Odiham Hook Hampshire RG29 1AA
Erection of a detached timber garden office within the rear garden of a Grade II listed dwelling.
-
26/01216/PREAPP Awaiting decision
Rosemary Cottage Pankridge Street Crondall Farnham GU10 5QZ
Proposed works include internal alterations to obtain an open plan layout, including a new compliant staircase, independent living room, rear kitchen/ dining living area. On the first floor, it is proposed to replace the existing two bedrooms for three bedrooms, family bathroom and en-suite. Externally, a 4m deep central extension, stepping down to 3.3m to the rest of the width, to host the open plan kitchen-living space. The existing rear dormer is replaced for two hipped twin roofs at first floor level. It is proposed to replace the uPVC windows with triple glazed timber casement windows incorporating a conservation-style central bar. Front oak frame open porch. Replacement of metal garage doors for timber barn style doors. Reduction of the side external level to achieve a minimum of 150mm between existing DPC and finished floor, and replacement of existing gas boiler for ASHP and solar panels located on the South-East facing roof.
-
26/01213/PREAPP Awaiting decision
17 The Cedars Fleet GU51 3YL
Replacement front porch
-
26/01201/OUT Awaiting decision
Land At Murrell Green London Road Murrell Green Hook
Outline application (with all matters reserved except access) for phased residential led mixed-use development comprising demolition of existing buildings/structures, provision of vehicular, cycle and pedestrian accesses (including details of 3no. accesses from the A30 London Road and 1no. access from the B3016 Odiham Road), development of up to 2,160 residential dwellings (including residential institution) (Use Class C2/C3), provision of employment, local centre and community uses (including education provision) (Use Classes E and F), blue and green infrastructure including sustainable drainage systems, public open space, sports pitches with pavilion, wildlife areas, Suitable Alternative Natural Green Space, and supporting infrastructure and associated works.
-
26/00777/PREAPP Decided
Laurel Cottage The Street North Warnborough Hook RG29 1BG
Erection of ground floor rear extension, works to existing outrigger including part demolition, restoration of existing outbuilding to habitable standard, and landscaping to rear garden.