Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00036/LBC

The Lodge High Street Hartley Wintney Hook RG27 8NY

Granted Hart Listed Building Consent

Proposal

Installation of an EV charging point

As published by the council, reference 26/00036/LBC

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Hart

  2. 2 Jul 2026

    Decision issued: Grant

  3. 26 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/00035/FUL Granted

    The Lodge High Street Hartley Wintney Hook RG27 8NY

    Installation of an EV charging point

    7 Jan 2026 0m away Full applications
  • 20/00657/LBC Granted

    22 High Street Hartley Wintney Hook RG27 8NY

    Installation of external security gate at side of building to fit across door.

    12 Mar 2020 27m away Heritage and listed buildings
  • 17/02430/CON Decided

    Pool & Sons High Street Hartley Wintney Hook RG27 8QA

    Approval of condition 3-Construction Method Statement- pursuant to 17/02430/FUL Demolition of existing building and erection of 8 no. dwellings together with associated access and landscaping.

    4 May 2020 57m away Conditions
  • 20/00901/LBC Granted

    63 High Street Hartley Wintney Hook RG27 8NY

    Stripping and re-slating of existing main roof slopes and rear high-level lean-to roof, including repairs to slating and lead valley gutter to rear lower roof

    20 Apr 2020 59m away Heritage and listed buildings
  • 26/00380/ADV Refused

    Mildmay House High Street Hartley Wintney Hook Hampshire RG27 8NY

    Display of 1 no. externally illuminated fascia sign and 1 no. projecting box sign; proposed repainting of fascia letters to white colour with external illumination (part retrospective)

    5 Mar 2026 62m away Advertising
  • 26/00352/PREAPP Decided

    The Cricketers Cricket Green Hartley Wintney Hook RG27 8QB

    Removal of ad-hoc structures to rear garden. New bi-fold doors and flat rooflight to form new garden room. New store formed.

    2 Mar 2026 63m away Outline

In Hart

  • 26/00958/LBC Granted

    Angus Cottage 51 High Street Odiham Hook RG29 1LF

    Demolition of retaining wall and replacement retaining wall

    8 Jun 2026 Heritage and listed buildings
  • 26/00542/LBC Granted

    Bramshill House Bramshill Park Bramshill Hook RG27 0JW

    Internal and external alterations to facilitate the conversion of Bramshill House to use as a single dwelling (alterations made to 23/02577/LBC)

    30 Mar 2026 Heritage and listed buildings
  • 26/00183/LBC Granted

    Ridgers Cottage Wingate Lane Long Sutton Hook Hampshire RG29 1SZ

    Replacement of existing leaking flat roof to rear of house with new flat roof membrane

    3 Feb 2026 Heritage and listed buildings
  • 26/00007/LBC Granted

    The Old Parsonage Lees Hill South Warnborough Hook Hampshire RG29 1RQ

    Remove the existing crazy paved driveway and replace with block paving (retrospective)

    4 Jan 2026 Heritage and listed buildings
  • 25/02424/LBC Granted

    2 Elvetham Farm Cottages Home Farm Road Hartley Wintney Hook Hampshire RG27 8AW

    Erection of a single storey side extension, insertion of a new first floor and supporting timber structural frame with pad foundations, installation of a new staircase, roof repairs and insulation works, replacement and refurbishment of windows and doors, cleaning of existing timber frame, installation of internal insulation and lime finishes and installation of mechanical and electrical services.

    27 Nov 2025 Heritage and listed buildings